Changes between Version 8 and Version 9 of GIR3.2_MeasuramentSystems
- Timestamp:
- 11/03/11 10:40:17 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GIR3.2_MeasuramentSystems
v8 v9 3 3 The Measurement System project, also known as Geni Instrument and Measurement Systems ([http://gims.wail.wisc.edu/ GIMS]), has one Spiral 3 milestone s3.f which defines the following to be delivered: Software with documentation, Installation guides, and Experimenter guides. 4 4 5 The GIMS system includes the following major components: 5 6 * GIMS Web Components - which includes a Control GUI, an Admin GUI, a Results Page and a Log Viewer 6 7 * GIMS Backend tha coordinates communication between all components. … … 12 13 13 14 The GIR evaluation covers the tools at [http://gims.wail.wisc.edu GIMS] web site which include: 14 15 * GIMS [http://gims.wail.wisc.edu/cgi-bin/LogViewer.cgi Log Viewer] 16 * GIMS [http://gims.wail.wisc.edu/cgi-bin/results/Results.cgi Results] 17 * GIMS [http://gims.wail.wisc.edu/cgi-bin/GIMSAdmin.cgi Admin] 18 * GIMS [http://gims.wail.wisc.edu/cgi-bin/GIMSControl.cgi Control] 15 * GIMS [http://gims.wail.wisc.edu/cgi-bin/LogViewer.cgi Log Viewer] 16 * GIMS [http://gims.wail.wisc.edu/cgi-bin/results/Results.cgi Results] 17 * GIMS [http://gims.wail.wisc.edu/cgi-bin/GIMSAdmin.cgi Admin] 18 * GIMS [http://gims.wail.wisc.edu/cgi-bin/GIMSControl.cgi Control] 19 19 20 20 Evaluation Time Frame: November 3, 2011.