Changes between Initial Version and Version 1 of GIMIv1.1NextSteps


Ignore:
Timestamp:
09/28/12 11:14:55 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GIMIv1.1NextSteps

    v1 v1  
     1[[PageOutline]]
     2
     3== GIMI v1.1 Design Topics ==
     4
     5=== Task List and Status ===
     6
     7|| '''Legend''' ||
     8||  [[Color(green,Complete)]] ||
     9||  [[Color(#B0E0E6, In Progress)]]  ||
     10||  [[Color(yellow, Blocked)]] ||
     11||  [[Color(#FF6600, "Won't Fix")]] ||
     12||  Not Started ||
     13
     14[[BR]]
     15
     16|| '''No''' || ''' Task ''' || '''Owner''' || '''Due''' || '''Status''' || ''' Notes''' ||
     17||  1 || Repackage Global Node code for VM OS (Fedora 15) ||  Matt and Jeanne ||  ||  [[Color(#B0E0E6, In Progress)]] ||  On 9/25, Matt believes fixed ||
     18||  2 || Check into building images for InstaGENI, and decide if a call with Utah would help || Hussam/Jeremy and Harry/Luisa/Jeanne ||  ||  [[Color(green, Complete)]] ||  Luisa provided [https://users.emulab.net/trac/protogeni/wiki/ImageHowTo instructions].  On 9/21, Jeremy needs to try, report on 9/28  ||
     19||  3 || Write a short description of a reference experiment based on Phoebus/XSP || Ezra ||   || [[Color(green,Complete)]] || On 9/14, completed;  see [http://groups.geni.net/geni/attachment/wiki/GEMINI/091412_gemini_phoebus.txt document] ||
     20||  3b || Describe an alternate reference experiment, that generates and manipulates traffic || Jim ||   || [[Color(#B0E0E6, In Progress)]] || On 9/28, will report ||
     21||  3c || Provide story board and reference workflow for experiments/tutorials|| Jeanne/Harry ||   || [[Color(green,Complete)]] || On 9/21, reviewed;  see [wiki:TestTutorialExperimentStoryboard story board] and [http://groups.geni.net/geni/wiki/TestTutorialExperimentWorkflow document] ||
     22||  3d || Need to agree on having GEMINI GEC15 tutorial follow steps in the reference workflow|| Jeanne/Harry and team ||   || [[Color(#B0E0E6, In Progress)]]||  ||
     23||  3e || Need to decide if tutorial will use only InstaGENI rack, or must also include ProtoGENI clusters || Team ||   || [[Color(#B0E0E6, In Progress)]]||  ||
     24||  3f || Need to identify owner of workflow for GEMINI GEC15 tutorial || Team ||   || [[Color(#B0E0E6, In Progress)]]||  ||
     25||  4 || Check into how we might clean up push/pull to/from UNIS || Ezra || || [[Color(#B0E0E6, In Progress)]]  || On 9/13, Possible solution is to make LAMP GUI unavailable until every node checks in, but not sure it is worth the effort. ||
     26||  5 || Sketch the flow between elements of the new structure to be introduced at GEC15 || Ezra || || [[Color(#B0E0E6, In Progress)]]  || On 9/21, reviewed sketch;  see [http://groups.geni.net/geni/attachment/wiki/GEMINI/gec15-components.pdf document] ||
     27||  6 || Merging development branches of GEMINI code || Ezra/Omer/Ahmed/Matt || 9/14?  || [[Color(#B0E0E6, In Progress)]] || Merging is happening in private repository, hope to have completed by 9/21 ||
     28||  7 || Organize GENI ABAC status review || Harry || || [[Color(green,Complete)]] || On 8/30. completed;  see [http://groups.geni.net/geni/attachment/wiki/GEMINI/Visio-083112_AuthenticationAuthorization_Figures.pdf document] ||
     29||  7b || Explain AA use in new clearinghouse || Harry || ||  [[Color(#B0E0E6, In Progress)]]  ||  ||
     30
     31||  8 || Define authentication and authorization (AA) workflow in GEMINI for various use cases || Ezra/Ahmed || || [[Color(#B0E0E6, In Progress)]]  || On 9/21, explained;  see [http://groups.geni.net/geni/attachment/wiki/GEMINI/AA-workflow.png  configuration] and [http://groups.geni.net/geni/attachment/wiki/GEMINI/092112_gemini_aa.txt document];  next step is to integrate with UNIS and try transaction;  on 9/28, see [http://groups.geni.net/geni/attachment/wiki/GEMINI/092812_gemini_aa_continued.txt  status] ||
     32||  9 || Current user email list does not work for outside users|| Jeanne ||  || [[Color(green,Complete)]] || On 9/14, Jeanne to setup Google Groups list ||
     33|| 10 || Need to revisit source control plan || Jeanne || || [[Color(#B0E0E6, In Progress)]] || On 9/21, presented current view in drawing;  see [http://groups.geni.net/geni/attachment/wiki/GEMINI/GEMINIRepositories.pdf document] ||
     34