Version 1 (modified by 15 years ago) (diff) | ,
---|
Facility Architecture
July 18, 2007 - NSF, Arlington, VA
Click on a file to download it. Files do not necessarily represent the opinion of the NSF, the GSC, or the GPO.
Members of the GENI Planning Group created these briefings in July 2007 to aid in the formal transition of planning and programmatic responsibilites to the GPO. The briefings contain a mixture of early GENI design work, programmatic ideas and issues, suggestions, and descriptions of ongoing research projects. Please consult the Planning Group's GENI Design Document (GDD)? series for detailed discussions of the group's design concepts.
See attached files below for Presentations.
Attachments (2)
-
event_arch_transition_71807.pdf (255.4 KB) - added by 16 years ago.
GENI Architecture: Transition Facility Architecture Working Group PDF
-
event_arch_transition_71807.ppt (1.2 MB) - added by 16 years ago.
GENI Architecture: Transition Facility Architecture Working Group PowerPoint
Download all attachments as: .zip