Changes between Version 1 and Version 2 of GENIStitch-GENI-Status-Report-GEC19


Ignore:
Timestamp:
04/17/14 20:28:07 (10 years ago)
Author:
tlehman@maxgigapop.net
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIStitch-GENI-Status-Report-GEC19

    v1 v2  
    88=== A. Milestones status ===
    99
    10 __''GENIStitch.S5.a: Develop high-level architecture for extending GENI stitching for a range of connection/transport types and L2 broadcast domains. Pursue a detailed architecture/design for specific cases of pure OpenFlow and GRE-tunneled connections. Present enhanced stitching architecture and design at GEC19. Deliver draft architecture and design document to the GENI Project Manager one week prior to GEC19.''__[[BR]]
     10__''GENIStitch.S5.a: Develop high-level architecture for extending GENI stitching for a range of connection/transport types and L2 broadcast domains. Pursue a detailed architecture/design for specific cases of pure !OpenFlow and GRE-tunneled connections. Present enhanced stitching architecture and design at GEC19. Deliver draft architecture and design document to the GENI Project Manager one week prior to GEC19.''__[[BR]]
    1111
    1212''Status:''[[BR]]