    v1 v2  
    11[[PageOutline]]
    22
    3 = InstaGENI Racks Project =
     3= Us Ignite InstaGENI Racks Project =
    44
    5 The InstaGENI Racks address the [wiki:GeniRacks GENI Rack Requirements] and follow the process below to deliver experimenter resources:
     5The InstaGENI InstaGENI (IG) Racks follow the process below to deliver experimenter resources:
    66
    77[[Image(Racks-project-outline.jpg)]]
     
    99== Ordering InstaGENI Racks ==
    1010
    11 Please contact Shannon Champion <schampion@matrixintegration.com> for quotes and information on purchasing InstaGENI racks.
     11Please contact <INSERT CONTACT INFO> for quotes and information on purchasing US Ignite InstaGENI racks.
    1212
    13 == InstaGENI Design ==
     13== US Ignite InstaGENI Design ==
    1414
    15 An [http://groups.geni.net/geni/attachment/wiki/GENIRacksHome/InstageniRacks/InstaGENI%20Design%20Document%20Rick%202-15%282%29.pdf InstaGENI Design Document] is available.
    16 HP also published [http://groups.geni.net/geni/wiki/GENIRacksHome/InstageniMfg detailed manufacturing documentation].
     15US Ignite InstaGENI racks are based on the [http://groups.geni.net/geni/attachment/wiki/GENIRacksHome/InstageniRacks/InstaGENI%20Design%20Document%20Rick%202-15%282%29.pdf InstaGENI Design].
    1716
    18 In response to the proposed design the following were discussed on the mail list [mailto:instageni-design@geni.net]:
    19 
    20  * [wiki:GENIRacksHome/InstageniUseCases InstaGENI Use Cases] - Nine Use Cases were submitted for discussion in the design review, discussions are captured in this page.  [[BR]]
    21  * [wiki:GENIRacksHome/InstageniOpenQuestions InstaGENI Open Questions] - Page capturing InstaGENI design question discussed at Design meeting and on the mail list.
    22 
    23 == InstaGENI Links ==
    24 
    25  * [http://groups.geni.net/geni/wiki/INSTAGENI InstaGENI Project page]
     17<INSERT MORE LINKS HERE>
    2618 
    27 == Acceptance Tests ==
    28 
    29 Although [wiki:GeniRacks GENI Rack Requirements] are the same for each of the GENI rack projects, a separate '''[wiki:GENIRacksHome/AcceptanceTests/InstageniAcceptanceTestsPlan InstaGENI System Acceptance Test Plan]''' is defined and is also based on the [wiki:GENIRacksHome/InstageniUseCases InstaGENI Use Cases].
    30 
    31 See the '''[wiki:GENIRacksHome/InstageniRacks/AcceptanceTestStatus InstaGENI Acceptance Test Status]''' page for test status and issues as the InstaGENI Acceptance Tests are executed.
    32 
    33 The [wiki:GENIRacksHome/InstageniRacks/AcceptanceTestReport InstaGENI Acceptance Test Report] will be made available upon project completion, this page will capture all test findings, configurations used, unresolved issues, etc.
    34 
    3519
    3620== Site Deployment ==
    3721
    38 A [http://groups.geni.net/geni/attachment/wiki/GENIRacksHome/InstageniRacks/ExampleSiteSurvey.pdf site survey] is completed by each site for each site deployment. The site survey capture all site specific information that will be initially configured for the rack, such as network details and initial local site administrator account. Once the rack has undergone the initial setup based on the site survey, the GPO works with Campus Engineering and the InstaGENI Rack Team to set up and coordinate testing of the control, !OpenFlow, and campus  connections, as well as site monitoring. An outline of the '''[wiki:GENIRacksHome/RacksChecklist GENI Rack Site Installation Checklist]''' is available that is a baseline for the [wiki:GENIRacksHome/GENIRacksDeploymentSites#InstaGENISites InstaGENI Sites] installation.
     22A [http://groups.geni.net/geni/attachment/wiki/GENIRacksHome/InstageniRacks/ExampleSiteSurvey.pdf site survey] is completed by each site for each site deployment. The site survey capture all site specific information that will be initially configured for the rack, such as network details and initial local site administrator account. Once the rack has undergone the initial setup based on the site survey, the GPO works with Campus Engineering to set up and coordinate testing of the control, !OpenFlow, and campus  connections, as well as site monitoring. An outline of the '''[wiki:GENIRacksHome/USIgniteRacksChecklist US Ignite GENI Rack Site Installation Checklist]''' is available that is a baseline for the [wiki:GENIRacksHome/GENIRacksDeploymentSites#USIgnite US Ingite IG Sites InstaGENI Sites] installation.
    3923
    40 The GPO also executed '''[wiki:GENIRacksHome/InstageniRacks/SiteConfirmationTests InstaGENI New Site Confirmation Tests]''' to validate the introduction of each new InstaGENI site. See the '''[wiki:GENIRacksHome/InstageniRacks/ConfirmationTestStatus InstaGENI Confirmation Test Status]''' page for all new InstaGENI sites. This page captures status as sites are deployed and validated for general use by Experimenters.  Upon completion of the site confirmation tests, campus engineering will be able to fully manage resources and access monitoring data for their site.
     24The GPO also executed '''[wiki:GENIRacksHome/USInstageniRacks/SiteConfirmationTests US Ignite IG Site Confirmation Tests]''' to validate the introduction of each new site and its network connectivity for GENI Stitching. See the '''[wiki:GENIRacksHome/USIgniteInstageniRacks/ConfirmationTestStatus US Ignite IG Confirmation Test Status]''' page for all US Ignite IG sites. This page captures status as sites are deployed and validated for general use by Experimenters.  Upon completion of the site confirmation tests, campus engineering will be able to fully manage resources and access monitoring data for their site.
    4125
    42 InstaGENI sites are also being configured to support GENI Network Stitching, for a list of operational InstaGENI sites that support stitching see the [wiki:GeniNetworkStitchingSites GENI Network Stitching Sites] page.
     26US Ignite IG sites are also configured to support GENI Network Stitching, for a list of operational GENI sites that support stitching see the [wiki:GeniNetworkStitchingSites GENI Network Stitching Sites] page.
    4327
    44 The GPO additionally creates a test slice that run continuously even after the confirmation tests.  This slice is part of the Plastic Slices measurements experiment and collects measurement data that can be found [wiki:PlasticSlices here].
    45 
    46 '''[wiki:GENIRacksHome/InstageniRacks/Operators Operators]''' information is available for InstaGENI Rack that capture sites connectivity details.
     28'''[wiki:GENIRacksHome/InstageniRacks/Operators Operators]''' information is available for US Ignite IG Racks that capture sites connectivity details.
    4729
    4830== Racks Administration ==
     
    5234See the ''' [wiki:GENIRacksHome/InstageniRacks/Monitoring InstaGENI Rack Monitoring]''' page for details about available rack monitoring features.
    5335
    54 Additional help is available by contacting us at help@geni.net or at the  real-time public IRC chat room chat.freenode.net channel #geni, see HowTo/ConnectToGENIChatRoom for details.
    55 
    56 == !Misc/Historical Links ==
    57 
    58 The [wiki:GENIRacksHome/InstageniRacks/AggregateSurvey InstaGENI Aggregate Surveys] is a historical page that captures the initial testing completed while the rack solution was first being implemented. Experiments included: a simple 2 node experiment, AM API Acceptance test results and the GPO Development Analysis of the results.
    59 
    6036
    6137----