Version 90 (modified by 7 years ago) (diff) | ,
---|
US Ignite InstaGENI Confirmation Test Status
This page captures the status for new US Ignite InstaGENI sites that are validated by the GPO upon completion of the US Ignite GENI Rack Site Installation Checklist?. The GPO executes Administration, Experiment, Network VLAN Stitching and Monitoring tests to confirm the ability of a New Site to operate within the GENI environment. Tests are defined in the US Ignite Site Confirmation Tests page.
Site Status
Confirmation Tests In Progress:
University of Louisiana - Lafayette
Completed Confirmation Tests successfully:
University of Texas - Dallas, University of Vermont - Burlington, Template Site GPO
Note the GPO US Ignite site was a temporary installation used only for testing. The site was deleted after testing completed, but test results remain here for the record.
Status Legend
Overall InstaGENI Site Status may be one of the following:
- Pass - Site confirmation tests completed successfully and site is ready for Experimenters.
- Pass: most criteria - Site partially confirmed with documented exceptions.
- Blocked - Site confirmation tests blocked by tracked issue.
- In Progress - Site confirmation tests in progress.
Individual Confirmation Test Status status may be one of the following:
- Color(green,Pass)? - Site Confirmation Test completed and met all criteria
- Color(#98FB98,Pass: most criteria)? - Site Confirmation Test completed and met most criteria with exceptions documented
- Color(red,Fail)? - Site Confirmation Test completed and failed.
- Color(orange,Blocked)? - Site Confirmation Blocked by ticketed issues.
- Color(#63B8FF,In Progress)? - Site Confirmation Test in progress.
US Ignite InstaGENI Sites Test Status
University of Louisiana - Lafayette
Overall Site Status:_ In Progress
Confirmation Test Start Date: 2017-05-08
Confirmation Test Completion Date: <<insert_date_here>>
Test | State | Completed | Tickets | Notes |
IG-CT-1 VM Resources | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-2 Bare Metal and VM | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-3 Multi-site Tunnel | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-5 Monitoring | Color(#63B8FF,In Progress)? | stitching check no data | ||
IG-CT-6 Administrative | ||||
IG-ST-1 New Site to GPO IG | Color(red,Fail)? | 2017-05-09 | No IP Connectivity over stitched link | |
IG-ST-2 Loop topology | Color(red,Fail)? | 2017-05-09 | No IP Connectivity over stitched links | |
IG-ST-3 Linear topology | Color(red,Fail)? | 2017-05-09 | No IP Connectivity over stitched links | |
IG-ST-4 New Site to GPO EG | Color(red,Fail)? | 2017-05-09 | No IP Connectivity over stitched links | |
IG-ST-5 Site Information | ||||
IG-ST-6 OpenFlow topology |
Confirmation Tests Logs: University of Louisiana US Ignite - Lafayette
Site Confirmation Request RSpecs: here
GENI Stitching Confirmation Request RSpecs: here
University of Vermont - Burlington
Overall Site Status:_ In Progress
Confirmation Test Start Date: 2017-05-08
Confirmation Test Completion Date: 2017-05-17
Test | State | Completed | Tickets | Notes |
IG-CT-1 VM Resources | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-2 Bare Metal and VM | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-3 Multi-site Tunnel | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-5 Monitoring | Color(green,Pass)? | 2017-05-16 | ||
IG-CT-6 Administrative | Color(green,Pass)? | 2017-05-16 | ||
IG-ST-1 New Site to GPO IG | Color(green,Pass)? | 2017-05-09 | ||
IG-ST-2 Loop topology | Color(green,Pass)? | 2017-05-09 | ||
IG-ST-3 Linear topology | Color(green,Pass)? | 2017-05-09 | ||
IG-ST-4 New Site to GPO EG | Color(green,Pass)? | 2017-05-09 | ||
IG-ST-5 Site Information | Color(green,Pass)? | 2017-05-17 | ||
IG-ST-6 OpenFlow topology | Color(green,Pass)? | 2017-05-12 |
Confirmation Tests Logs: University of Vermont - Burlington
Site Confirmation Request RSpecs: here
GENI Stitching Confirmation Request RSpecs: here
University of Texas - Dallas
Overall Site Status:_ In Progress
Confirmation Test Start Date: 2017-05-08
Confirmation Test Completion Date: 2017-05-16
Test | State | Completed | Tickets | Notes |
IG-CT-1 VM Resources | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-2 Bare Metal and VM | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-3 Multi-site Tunnel | Color(green,Pass)? | 2017-05-09 | ||
IG-CT-5 Monitoring | Color(green,Pass)? | 2017-05-16 | Aggregate URL Incorrect in Monitoring | |
IG-CT-6 Administrative | Color(green,Pass)? | 2017-05-16 | ||
IG-ST-1 New Site to GPO IG | Color(green,Pass)? | 2017-05-09 | ||
IG-ST-2 Loop topology | Color(green,Pass)? | 2017-05-09 | ||
IG-ST-3 Linear topology | Color(green,Pass)? | 2017-05-09 | ||
IG-ST-4 New Site to GPO EG | Color(green,Pass)? | 2017-05-09 | ||
IG-ST-5 Site Information | Color(green,Pass)? | 2017-05-16 | ||
IG-ST-6 OpenFlow topology | Color(green,Pass)? | 2017-05-12 |
Confirmation Tests Logs: University of Texas - Dallas
Site Confirmation Request RSpecs: here
GENI Stitching Confirmation Request RSpecs: here
Template Site GPO US Ignite - Cambridge
Overall Site Status:_ Pass: most criteria
Confirmation Test Start Date: 2017-02-22
Confirmation Test Completion Date: 2017-02-28
Test | State | Completed | Tickets | Notes |
IG-CT-1 VM Resources | Color(green,Pass)? | 2017-02-24 | ||
IG-CT-2 Bare Metal and VM | Color(green,Pass)? | 2017-02-24 | ||
IG-CT-3 Multi-site Tunnel | Color(green,Pass)? | 2017-02-27 | EGRE Tunnel required IP table patch | |
IG-CT-5 Monitoring | N/A | Not configured for template rack | ||
IG-CT-6 Administrative | Color(green,Pass)? | 2017-02-28 | ||
IG-ST-1 New Site to GPO IG | Color(green,Pass)? | 2017-02-27 | ||
IG-ST-2 Loop topology | Color(red,Fail)? | 2017-02-28 | Multi-link problem specific to GPO rack, not reproducible at other sites. | |
IG-ST-3 Linear topology | Color(red,Fail)? | 2017-02-28 | Multi-link problem specific to GPO rack, not reproducible at other sites. | |
IG-ST-4 New Site to GPO EG | Color(green,Pass)? | 2017-02-27 | ||
IG-ST-5 Site Information | N/A | Temporary site | ||
IG-ST-6 OpenFlow topology | Color(green,Pass)? | 2017-02-22 |
Confirmation Tests Logs: GPO US Ignite Template Site
Site Confirmation Request RSpecs: here
GENI Stitching Confirmation Request RSpecs: here
OF 1.3 Controller Configuration
Testing for OpenFlow over GENI stitched connection (IG-ST-6) is completed with Ryu Controller. One modification is required to any controller to handle the required use of Rule Table ID 100 for HP switches. Below are instructions on the required changes for both Ryu and FloodLight OpenFlow Controller.
Ryu Controller
The latest Ryu check out of the Master branch was used (commit a197d87375808c4f99b48af3852eb5d1c986a6a9; Date 2017-05-09). Used the OpenFlow 1.3 Simple Simple Switch application with the follow modification to handle the required use of Rule Table ID 100 for HP switches:
lnevers@controller:/local/ryu/ryu/app$ diff simple_switch_13.py simple_switch_13_ig.py 56a57 > table_id = 100 59c60 < priority=priority, match=match, --- > priority=priority, table_id=table_id, match=match, 62c63 < mod = parser.OFPFlowMod(datapath=datapath, priority=priority, --- > mod = parser.OFPFlowMod(datapath=datapath, priority=priority, table_id=table_id,
FloodLight Controller
The latest FloodLight checkout of the Master branch was used (commit b5be294d8484d7eab0ed840dd15c6259a3b0eaaa; Date 2017-03-07) with the following changes to enable learning switch and use Rule 100:
- The floodlight/src/main/resources/floodlightdefault.properties setting were modified to use Learning Switch:
net.floodlightcontroller.learningswitch.LearningSwitch,\
- For HP switches OpenFlow 1.3 a multi-table rules pipeline is used, in which the Policy Table is expected with a tableid of 100. In order for this to work, the FloodLight controller must be modified to apply rules in table id 100 for so, but FloodLight defaults to zero (0). To modify rules table id number to 100 added to floodlight/src/main/resources/floodlightdefault.properties the following:
net.floodlightcontroller.core.internal.OFSwitchManager.defaultMaxTablesToReceiveTableMissFlow=101 net.floodlightcontroller.core.internal.OFSwitchManager.maxTablesToReceiveTableMissFlowPerDpid={"0":"101"}
Information found in this FloodLight Development thread.