Changes between Version 6 and Version 7 of GENIRacksHome/RacksChecklist
- Timestamp:
- 02/01/13 11:29:07 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GENIRacksHome/RacksChecklist
v6 v7 36 36 37 37 == Coordinate data plane connection and testing == 38 * If no GMOC master ticket has been created for the rack installation, then the GPO will ensure a ticket gets created before beginning data plane testing 38 39 * Coordinate with the GPO to set up upstream mesoscale connections 39 40 * Before actually establishing a connection, open a GMOC ticket to track data plane connection and testing