Changes between Version 27 and Version 28 of GENIRacksHome/RacksChecklist
- Timestamp:
- 06/17/13 16:43:42 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GENIRacksHome/RacksChecklist
v27 v28 3 3 = High level steps for GENI rack installation = 4 4 Each rack site develops their own installation and test plan, which roughly follows these steps. Please coordinate with the GPO and the rack development teams when performing the installation. 5 6 == Common rack name chosen == 7 * The GPO selects a common rack name for GENI tools to use for this rack using a pattern 8 * The GPO proposes the common rack name to the rack team, the GMOC, and the site contact, to ensure that there are no major issues with the proposed name 5 9 6 10 == Work with rack teams to identify site specific information and shipping ==