Changes between Version 25 and Version 26 of GENIRacksHome/RacksChecklist


Ignore:
Timestamp:
06/12/13 14:42:58 (11 years ago)
Author:
hdempsey@bbn.com
Comment:

minor changes for compatibility with the rack release procedure

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/RacksChecklist

    v25 v26  
    5353 == Set up monitoring ==
    5454 * Configure active Aggregate Manager monitoring
    55   * Coordinate with the GMOC for setting your site up to submit active monitoring data to the GMOC database Live monitoring data is available on the GMOC pages.
     55  * Coordinate with the GMOC for setting your site up to submit active monitoring data to the GMOC database. Live monitoring data is available on the GMOC pages.
    5656  * Coordinate with the rack team to configure FOAM monitoring ([http://groups.geni.net/geni/wiki/TangoGeniMonitoring/FoamConfiguration instructions])
    5757  * Coordinate with the rack team to configure compute aggregate manager monitoring
     
    6868
    6969 == Coordinate confirmation testing ==
    70  * Coordinate with the GPO on site confirmation testing
     70 * Coordinate with the GPO to successfully complete site confirmation testing
    7171  * [http://groups.geni.net/geni/wiki/GENIRacksHome/ExogeniRacks/SiteConfirmationTests ExoGENI New Site Confirmation Tests]
    7272  * [http://groups.geni.net/geni/wiki/GENIRacksHome/InstageniRacks/SiteConfirmationTests InstaGENI New Site Confirmation Tests]
     
    7676
    7777 == Site performs their own testing ==
    78  Sites do their own testing as needed for their particular deployments.  The site owner decides when they are ready to open the site to experimenters.  This is also called moving the site to production.  A site may have multiple GENI resources (for example a rack and several OpenFlow switches) that move to production at different times.
     78 Sites do their own testing as needed for their particular deployments.  The site owner decides when they are ready to open the site to experimenters.  The site owner must confirm that they are ready to support experimenters before a site can become a production GENI site (a.k.a. moving to production).  A site may have multiple GENI resources (for example a rack and several OpenFlow switches) that move to production at different times.
    7979
    8080 == Perform final administrative steps before moving to production ==
    8181 * Work with GMOC to complete monitoring, mailing list, and emergency contact hand-off procedures for your site. When the procedures are complete, the GMOC begins 24x7 monitoring, tracking and dispatching questions and events that involve your site.
    8282 * Subscribe an operational contact for your rack to the [http://lists.geni.net/mailman/listinfo/response-team response-team@geni.net mailing list]
    83  * Coordinate with the GPO to connect downstream campus resources to the GENI rack.
     83 * Coordinate with the GPO to connect and integrate downstream campus resources with the GENI rack.  In most cases, this will be a campus SDN network supporting multiple hosts.
    8484
    8585 == Move to production ==