Version 16 (modified by 9 years ago) (diff) | ,
---|
OpenGENI Racks
<<<INSERT SHORT DESCRIPTION>>>
Installation
- OpenGENI Installation Guide
- Installing Monitoring on OpenGENI
- OpenGENI Update Procedure
- OpenGENI Installation Check List
Administration
- OpenGENI Administration Guide
- Tools for debugging and Managing OpenGENI
- OpenStack Dashboard to Manage Resources
- Emergency Stop
- Monitoring Procedures
- Powering Down Rack
- Powering Up Rack
- Rack Administration Accounts
- OpenGENI Dell Parts List
Experimenters
Architecture, Software, and Design
- GRAM Network and Software Architecture Description
- Software Release Procedure
- Software Updates
- Getting OpenGENI software
OpenGENI Provisional Racks
OpenGENI Internal/Development Racks - NOT FOR PUBLIC USE
GRAM Acceptance Testing
The OpenGENI Acceptance Test Plan was defined to verify the GENI Rack Requirements for the Dell Rack. Several test efforts took place, the status and findings for each is listed below:
Summary status and findings | Test Report(s) |
Acceptance Test Status - May 2013 | Acceptance Test Report - May 2013 (05/20/2014) |
Acceptance Test Status - December 2013 | Acceptance Test Report - Dec 2013 (12/18/2013) |
Acceptance Test Status - April 2014 | Acceptance Test Report (05/19/2014); Intermediate Test Report - for Dell Meeting (04/18/2014) |