= OG-ADM-1: Rack Receipt and Inventory Test = This page captures status for the test case OG-ADM-1. For additional information see the [wiki:GENIRacksHome/OpenGENIRacks/AcceptanceTestStatusMay2013 Acceptance Test Status - May 2013] page overall status, or the [wiki:GENIRacksHome/AcceptanceTests/OpenGENIAcceptanceTestsPlan OpenGENI Acceptance Test Plan] for details about the planned evaluation. ''Last Update: 2013/05/XX" || '''Step''' || '''State'''||''' Notes ''' || '''Tickets''' || || Step 1 ||Not Planned || || || || Step 2 ||Not Planned || || || || Step 3 ||Not Planned || || || || Step 4 ||Not Planned || || || || Step 5 ||Not Planned || || || || Step 6 ||Not Planned || || || [[BR]] || '''State Legend''' || '''Description''' || ||[[span(Pass, style=background-color: green )]] || Test completed and met all criteria || ||[[span(Pass: most criteria, style=background-color: #98FB98)]]|| Test completed and met most criteria. Exceptions documented || ||[[span(Fail, style=background-color: red)]] || Test completed and failed to meet criteria. || ||[[span(Complete, style=background-color: yellow)]] || Test completed but will require re-execution due to expected changes || ||[[span(Blocked, style=background-color: orange)]] || Blocked by ticketed issue(s). || ||[[span(In Progress, style=background-color: #63B8FF)]]|| Currently under test. || ||[[span(Not Planned)]] || This area is not part of initial evaluation || = Test Plan Steps = == 1.Power and wire the BBN rack == This type of testing is not part of the initial evaluation. == 2. Administrator configure OpenGENI using an administrator account configure the gramm.gpolab.bbn.com DNS namespace and 192.1.242.128/25 IP space, and enters all public IP addresses used by the rack into DNS. == This type of testing is not part of the initial evaluation. == 3. Administrator requests and receives administrator accounts on the rack and receive read access to all OpenGENI monitoring of the rack. == This type of testing is not part of the initial evaluation. == 4. Administrator inventories the physical rack contents, network connections and VLAN configuration, and power connectivity, using standard operational inventories. == This type of testing is not part of the initial evaluation. == 5 Administrator, OpenGENI team, and GMOC share information about contact information and change control procedures, and OpenGENI operators subscribe to GENI operations mailing lists and submit their contact information to GMOC. == This type of testing is not part of the initial evaluation. == 6. Administrator reviews the documented parts list, power requirements, physical and logical network connectivity requirements, and site administrator community requirements, verifying that these documents should be sufficient for a new site to use when setting up a rack. == This type of testing is not part of the initial evaluation.