wiki:GENIRacksHome/OpenGENIRacks/AcceptanceTestStatusDec2013/OG-ADM-3

Version 2 (modified by lnevers@bbn.com, 11 years ago) (diff)

--

OG-ADM-3: Full Rack Reboot Test

This page captures status for the test case OG-ADM-3. For additional information see the Acceptance Test Status - December 2013 page overall status, or the OpenGENI Acceptance Test Plan for details about the planned evaluation.

Last Update: 2013/12/16"

Step State Notes Tickets
Step 1 #83
Step 2
Step 3


State Legend Description
Pass Test completed and met all criteria
Pass: most criteria Test completed and met most criteria. Exceptions documented
Fail Test completed and failed to meet criteria.
Complete Test completed but will require re-execution due to expected changes
Blocked Blocked by ticketed issue(s).
In Progress Currently under test.
Not Planned This area is not part of initial evaluation

Test Plan Steps

Evaluation Notes: Verify #83.

Step 1. Review relevant documentation

Review relevant rack documentation about shutdown options and make a plan for the order in which to shutdown each component.

Step 2. Shutdown all devices and verify

Cleanly shutdown and/or hard-power-off all devices in the rack, and verify that everything in the rack is powered down.

Step 3. Power on rack and verify health

Power on all devices, bring all logical components back online, and use monitoring and comprehensive health tests to verify that the rack is healthy again.