= OG-ADM-3: Full Rack Reboot Test = This page captures status for the test case OG-ADM-3. For additional information see the [wiki:GENIRacksHome/OpenGENIRacks/AcceptanceTestStatusDec2013 Acceptance Test Status - December 2013] page overall status, or the [wiki:GENIRacksHome/AcceptanceTests/OpenGENIAcceptanceTestsPlan OpenGENI Acceptance Test Plan] for details about the planned evaluation. ''Last Update: 2013/12/16" || '''Step''' || '''State'''||''' Notes ''' || '''Tickets''' || || Step 1 || || || #83 || || Step 2 || || || || || Step 3 || || || || [[BR]] || '''State Legend''' || '''Description''' || ||[[span(Pass, style=background-color: green )]] || Test completed and met all criteria || ||[[span(Pass: most criteria, style=background-color: #98FB98)]]|| Test completed and met most criteria. Exceptions documented || ||[[span(Fail, style=background-color: red)]] || Test completed and failed to meet criteria. || ||[[span(Complete, style=background-color: yellow)]] || Test completed but will require re-execution due to expected changes || ||[[span(Blocked, style=background-color: orange)]] || Blocked by ticketed issue(s). || ||[[span(In Progress, style=background-color: #63B8FF)]]|| Currently under test. || ||[[span(Not Planned)]] || This area is not part of initial evaluation || = Test Plan Steps = ''Evaluation Notes:'' Verify #83. == Step 1. Review relevant documentation == Review relevant rack documentation about shutdown options and make a plan for the order in which to shutdown each component. == Step 2. Shutdown all devices and verify == Cleanly shutdown and/or hard-power-off all devices in the rack, and verify that everything in the rack is powered down. == Step 3. Power on rack and verify health == Power on all devices, bring all logical components back online, and use monitoring and comprehensive health tests to verify that the rack is healthy again.