Version 4 (modified by 10 years ago) (diff) | ,
---|
OG-ADM-1: Rack Receipt and Inventory Test
This page captures status for the test case OG-ADM-1. For additional information see the Acceptance Test Status - April 2014 page overall status, or the OpenGENI Acceptance Test Plan for details about the planned evaluation.
Last Update: 2014/04/09
Step | State | Notes | Tickets |
Step 1 | Not Planned | ||
Step 2 | Not Planned | ||
Step 3 | Pass | ||
Step 4 | Not Planned | ||
Step 5 | Blocked | No data collection or reporting, some local logfiles | 49 |
Step 6 | In Progress | Clemson Rack Information incorrect | |
State Legend | Description |
Pass | Test completed and met all criteria |
Pass: most criteria | Test completed and met most criteria. Exceptions documented |
Fail | Test completed and failed to meet criteria. |
Complete | Test completed but will require re-execution due to expected changes |
Blocked | Blocked by ticketed issue(s). |
In Progress | Currently under test. |
Not Planned | This area is not part of initial evaluation |
Test Plan Steps
1.Power and wire the BBN rack
This step is not part of this evaluation. Rack was set up and running at the time of this evaluation.
2. Administrator configure OpenGENI using an administrator account
Administrator configures OpenGENI using an administrative account to configure the gramm.gpolab.bbn.com DNS namespace and 192.1.242.128/25 IP space, and enters all public IP addresses used by the rack into DNS.
This step is not part of this evaluation. Rack was set up and running at the time of this evaluation. Publically routable IP Addresses where allocated for experiments, and is verified in experimenter tests.
3. Administrator requests and receives administrator accounts
Administrator requests and receives administrator accounts on the rack and receive read access to all OpenGENI monitoring of the rack.
This step was executed when an administrative account was requested and used to successfully access each of the devices in the rack for administrative tests. Was able to verify administrative access as described in http://groups.geni.net/geni/wiki/GENIRacksAdministration/OpenGENIRacksAdminAccounts page. Also verified account removal. No Issues found!
4. Administrator inventories the rack
Administrator inventories the physical rack contents, network connections and VLAN configuration, and power connectivity, using standard operational inventories. This step is not part of this evaluation. Rack was set up and running at the time of this evaluation.
5. Administrator, OpenGENI team, and GMOC share information
Administrator, OpenGENI team, and GMOC share information about contact information and change control procedures, and OpenGENI operators subscribe to GENI operations mailing lists and submit their contact information to GMOC.
Monitoring is still being developed and information is available only in local logs. ticket 9
This is the process running on the control node:
gram 2428 1 0 Apr08 ? 00:00:00 su -s /bin/sh -c exec python /home/gram/gram/src/monitor/gram-mon.py gram gram 2561 2428 0 Apr08 ? 00:00:26 python /home/gram/gram/src/monitor/gram-mon.py
The gram-mon process generates local logs of monitoring data which are located at "/var/log/upstart/gram-mon.log". Following are samples of data in the monitoring log:
$ sudo tail -100f /var/log/upstart/gram-mon.log Resource: urn:publicid:IDN+clemson-clemson-control-1.clemson.edu+node+clemson-clemson-compute-1 _Resource__state Unknown _last_modified 0 __description None _pop POP: urn:publicid:IDN+gmoc.geni.net+pop+BOS_CAMBRIDGE (already seen) __id urn:publicid:IDN+clemson-clemson-control-1.clemson.edu+node+clemson-clemson-compute-1 __type vmserver _intfs __operator Organization: urn:publicid:IDN+gmoc.geni.net+organization+OpenGENIGPO (already seen) _aggregate Aggregate: urn:publicid:IDN+bbn-cam-ctrl-1+authority+am (already seen) _slivers _measurements Resource: urn:publicid:IDN+clemson-clemson-control-1.clemson.edu+node+clemson-clemson-compute-2 _Resource__state Unknown _last_modified 0 __description None _pop POP: urn:publicid:IDN+gmoc.geni.net+pop+BOS_CAMBRIDGE (already seen) __id urn:publicid:IDN+clemson-clemson-control-1.clemson.edu+node+clemson-clemson-compute-2 __type vmserver _intfs __operator Organization: urn:publicid:IDN+gmoc.geni.net+organization+OpenGENIGPO (already seen) _aggregate Aggregate: urn:publicid:IDN+bbn-cam-ctrl-1+authority+am (already seen) _slivers _measurements _slivers _measurements __id urn:publicid:IDN+gmoc.geni.net+pop+BOS_CAMBRIDGE __location None __operator None _authorities _measurements ********************* Latest snapshot file: /etc/gram/snapshots/gram/2014_04_09_14_09_36_0.json
6. Administrator reviews the OpenGENI Documentation
Administrator reviews the documented parts list, power requirements, physical and logical network connectivity requirements, and site administrator community requirements, verifying that these documents should be sufficient for a new site to use when setting up a rack.
A parts list is available at OpenGENI Clemson Rack Details parts list page, which lists:
- 3 Dell PowerEdge R620
- 1 Dell PowerConnect 7048 switch
- 1 Dell Force10 S4810P OpenFlow switch
- 3 SFP cables
- 9 Ethernet cables
- 3 SFP-ethernet converters
- 1 Serial cable
- 230V UPS (Optional)
- Rack Size - Width: 23.8" (605mm), Depth: 42.1" (1070mm), Weight: 298 lbs (135 kg)
Power requirements are available at OpenGENI Clemson Rack Details power requirements page, which lists:
- OpenGENI Racks come with a 5600W, 230V UPS to power all the components. The power supply has the following technical specs:
- Power Rating: 5600 Watts
- Runtimes: 5.5 mins @ full load, 17 mins @ ½ load
- Input Voltages: 220, 230, 240 VAC
- Output Voltages: 220, 230, 240 VAC
- Input Connection: Hardwired
- Output Receptacles: IEC-60320 C13(X6), IEC-60320 C19(X4)
- Physical Specs (w x h x d – wt): 17.2” x 6.75” x 31.1” – 158lbs
- Heat Dissipation in Normal Mode BTU/hr: 956
Physical and Logical connection requirements are described at OpenGENI Clemson Rack Details network configuration page, which lists:
Host | Control Plane Address | PowerConnect Port (Control Plane) | External Address | PowerConnect Port (External Plane) | Management Address | PowerConnect Port (Management Plane) | Data Plane Address | Force10 Port (Data Plane) |
clemson-control | 10.10.8.100 | 13 | 130.127.39.170 | 25 | 10.10.6.100 | 1 | 10.10.5.100 | 0 |
clemson-compute-1 | 10.10.8.101 | 14 | 130.127.39.171 | 26 | 10.10.6.101 | 2 | 10.10.5.101 | 2 |
clemson-compute-2 | 10.10.8.102 | 15 | 130.127.39.172 | 27 | 10.10.6.102 | 3 | 10.10.5.102 | 1 |
Administrative Procedures are at https://superior.bbn.com/trac/bbn-rack/wiki/DellRackDetails#AdministrationProcedures and describe the following:
- Powering Up Rack
- Powering Down Rack
- integrated Dell Remote Access Controller (iDRAC) Configuration
- Rack Administration Accounts
- Software Repository
- Software Updates
- Emergency Stop