= GR-ADM-1: Rack Receipt and Inventory Test = This page captures status for the test case GR-ADM-1. For additional information see the [wiki:GENIRacksHome/GRAMRacks/AcceptanceTestStatusApr2014 Acceptance Test Status - April 2014] page overall status, or the [wiki:GENIRacksHome/AcceptanceTests/GRAMAcceptanceTestsPlan GRAM Acceptance Test Plan] for details about the planned evaluation. ''Last Update: 2014/04/09 || '''Step''' || '''State'''||''' Notes ''' || '''Tickets''' || || Step 1 ||Not Planned || || || || Step 2 ||Not Planned || || || || Step 3 ||[[span(Pass, style=background-color: green )]] || || || || Step 4 ||Not Planned || || || || Step 5 ||[[span(Blocked, style=background-color: orange)]] ||No data collection or reporting, some local logfiles|| 49 || || Step 6 ||[[span(In Progress, style=background-color: #63B8FF)]] || Clemson Rack Information incorrect || ~~113~~ || [[BR]] || '''State Legend''' || '''Description''' || ||[[span(Pass, style=background-color: green )]] || Test completed and met all criteria || ||[[span(Pass: most criteria, style=background-color: #98FB98)]]|| Test completed and met most criteria. Exceptions documented || ||[[span(Fail, style=background-color: red)]] || Test completed and failed to meet criteria. || ||[[span(Complete, style=background-color: yellow)]] || Test completed but will require re-execution due to expected changes || ||[[span(Blocked, style=background-color: orange)]] || Blocked by ticketed issue(s). || ||[[span(In Progress, style=background-color: #63B8FF)]]|| Currently under test. || ||[[span(Not Planned)]] || This area is not part of initial evaluation || = Test Plan Steps = == 1.Power and wire the BBN rack == This step is not part of this evaluation. Rack was set up and running at the time of this evaluation. == 2. Administrator configure GRAM using an administrator account == Administrator configures GRAM using an administrative account to configure the gramm.gpolab.bbn.com DNS namespace and 192.1.242.128/25 IP space, and enters all public IP addresses used by the rack into DNS. This step is not part of this evaluation. Rack was set up and running at the time of this evaluation. Publically routable IP Addresses where allocated for experiments, and is verified in experimenter tests. == 3. Administrator requests and receives administrator accounts == Administrator requests and receives administrator accounts on the rack and receive read access to all GRAM monitoring of the rack. This step was executed when an administrative account was requested and used to successfully access each of the devices in the rack for administrative tests. Was able to verify administrative access as described in http://groups.geni.net/geni/wiki/GENIRacksAdministration/GRAMRacksAdminAccounts page. Also verified account removal. No Issues found! == 4. Administrator inventories the rack == Administrator inventories the physical rack contents, network connections and VLAN configuration, and power connectivity, using standard operational inventories. This step is not part of this evaluation. Rack was set up and running at the time of this evaluation. == 5. Administrator, GRAM team, and GMOC share information == Administrator, GRAM team, and GMOC share information about contact information and change control procedures, and GRAM operators subscribe to GENI operations mailing lists and submit their contact information to GMOC. Monitoring is still being developed and information is available only in local logs. ticket 9 This is the process running on the control node: {{{ gram 2428 1 0 Apr08 ? 00:00:00 su -s /bin/sh -c exec python /home/gram/gram/src/monitor/gram-mon.py gram gram 2561 2428 0 Apr08 ? 00:00:26 python /home/gram/gram/src/monitor/gram-mon.py }}} The ''gram-mon'' process generates local logs of monitoring data which are located at "/var/log/upstart/gram-mon.log". Following are samples of data in the monitoring log: {{{ $ sudo tail -100f /var/log/upstart/gram-mon.log Resource: urn:publicid:IDN+clemson-clemson-control-1.clemson.edu+node+clemson-clemson-compute-1 _Resource__state Unknown _last_modified 0 __description None _pop POP: urn:publicid:IDN+gmoc.geni.net+pop+BOS_CAMBRIDGE (already seen) __id urn:publicid:IDN+clemson-clemson-control-1.clemson.edu+node+clemson-clemson-compute-1 __type vmserver _intfs __operator Organization: urn:publicid:IDN+gmoc.geni.net+organization+GRAMGPO (already seen) _aggregate Aggregate: urn:publicid:IDN+bbn-cam-ctrl-1+authority+am (already seen) _slivers _measurements Resource: urn:publicid:IDN+clemson-clemson-control-1.clemson.edu+node+clemson-clemson-compute-2 _Resource__state Unknown _last_modified 0 __description None _pop POP: urn:publicid:IDN+gmoc.geni.net+pop+BOS_CAMBRIDGE (already seen) __id urn:publicid:IDN+clemson-clemson-control-1.clemson.edu+node+clemson-clemson-compute-2 __type vmserver _intfs __operator Organization: urn:publicid:IDN+gmoc.geni.net+organization+GRAMGPO (already seen) _aggregate Aggregate: urn:publicid:IDN+bbn-cam-ctrl-1+authority+am (already seen) _slivers _measurements _slivers _measurements __id urn:publicid:IDN+gmoc.geni.net+pop+BOS_CAMBRIDGE __location None __operator None _authorities _measurements ********************* Latest snapshot file: /etc/gram/snapshots/gram/2014_04_09_14_09_36_0.json }}} == 6. Administrator reviews the GRAM Documentation == Administrator reviews the documented parts list, power requirements, physical and logical network connectivity requirements, and site administrator community requirements, verifying that these documents should be sufficient for a new site to use when setting up a rack. A parts list is available at https://superior.bbn.com/trac/bbn-rack/wiki/ClemsonRackDetails#PartsList, which lists: * 3 Dell !PowerEdge R620 * 1 Dell !PowerConnect 7048 switch * 1 Dell Force10 S4810P !OpenFlow switch * 3 SFP cables * 9 Ethernet cables * 3 SFP-ethernet converters * 1 Serial cable * 230V UPS (Optional) * Rack Size - Width: 23.8" (605mm), Depth: 42.1" (1070mm), Weight: 298 lbs (135 kg) Power requirements are available at https://superior.bbn.com/trac/bbn-rack/wiki/ClemsonRackDetails#PowerRequirements, which lists: * GRAM Racks come with a 5600W, 230V UPS to power all the components. The power supply has the following technical specs: * Power Rating: 5600 Watts * Runtimes: 5.5 mins @ full load, 17 mins @ ½ load * Input Voltages: 220, 230, 240 VAC * Output Voltages: 220, 230, 240 VAC * Input Connection: Hardwired * Output Receptacles: IEC-60320 C13(X6), IEC-60320 C19(X4) * Physical Specs (w x h x d – wt): 17.2” x 6.75” x 31.1” – 158lbs * Heat Dissipation in Normal Mode BTU/hr: 956 Physical and Logical connection requirements are described at https://superior.bbn.com/trac/bbn-rack/wiki/ClemsonRackDetails#NetworkConfiguration, which lists: ||'''Host'''||'''Control Plane Address'''||'''!PowerConnect Port (Control Plane)'''||'''External Address'''||'''!PowerConnect Port (External Plane)'''||'''Management Address'''||'''!PowerConnect Port (Management Plane)'''||'''Data Plane Address'''||'''Force10 Port (Data Plane)'''|| ||clemson-control||10.10.8.100||13||130.127.39.170||25||10.10.6.100||1||10.10.5.100||0|| ||clemson-compute-1||10.10.8.101||14||130.127.39.171||26||10.10.6.101||2||10.10.5.101||2|| ||clemson-compute-2||10.10.8.102||15||130.127.39.172||27||10.10.6.102||3||10.10.5.102||1|| Administrative Procedures are at https://superior.bbn.com/trac/bbn-rack/wiki/DellRackDetails#AdministrationProcedures and describe the following: * Powering Up Rack * Powering Down Rack * integrated Dell Remote Access Controller (iDRAC) Configuration * Rack Administration Accounts * Software Repository * Software Updates * Emergency Stop