    38 A [site survey] is completed by each site for each site deployment. The GPO works with Campus Engineering and the InstaGENI Rack Team to set up and coordinate testing of the control, !OpenFlow, and campus  connections, as well as site monitoring. An outline of the '''[wiki:GENIRacksHome/RacksChecklist GENI Rack Site Installation Checklist]''' is available that is a baseline for the [wiki:GENIRacksHome/GENIRacksDeploymentSites#InstaGENISites InstaGENI Sites] installation.
     38A [wiki:GENIRacksHome/InstageniRacks/ExampleSiteSurvey.pdf site survey] is completed by each site for each site deployment. The [wiki:GENIRacksHome/InstageniRacks/ExampleSiteSurvey.pdf site survey] capture all site specific information that will be initially configured for the rack, such as network details and initial local site administrator account. Once the rack has undergone the initial setup based on the [wiki:GENIRacksHome/InstageniRacks/ExampleSiteSurvey.pdf site survey], the GPO works with Campus Engineering and the InstaGENI Rack Team to set up and coordinate testing of the control, !OpenFlow, and campus  connections, as well as site monitoring. An outline of the '''[wiki:GENIRacksHome/RacksChecklist GENI Rack Site Installation Checklist]''' is available that is a baseline for the [wiki:GENIRacksHome/GENIRacksDeploymentSites#InstaGENISites InstaGENI Sites] installation.
    3939
    4040The GPO also executed '''[wiki:GENIRacksHome/InstageniRacks/SiteConfirmationTests InstaGENI New Site Confirmation Tests]''' to validate the introduction of each new InstaGENI site. See the '''[wiki:GENIRacksHome/InstageniRacks/ConfirmationTestStatus InstaGENI Confirmation Test Status]''' page for all new InstaGENI sites. This page captures status as sites are deployed and validated for general use by Experimenters.  Upon completion of the site confirmation tests, campus engineering will be able to fully manage resources and access monitoring data for their site.