Changes between Version 8 and Version 9 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics
- Timestamp:
- 02/27/13 09:45:30 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics
v8 v9 8 8 Niky is modifying click router setup to run in two racks scenario. On 02/26 she was implementing click router environment workarounds. Expect to be able to run test by Friday March 1. 9 9 10 11 10 === Administrative Tests === 12 11 13 __IG-ADM-1: Rack Receipt and Inventory Test__ ---> Expected Date: March 13 12 __IG-ADM-1: Rack Receipt and Inventory Test__ ---> Expected Date: March 13 [[BR]] 14 13 Only remaining blocker is government property tags. 15 14 … … 20 19 An Emergency Stop Procedure detailed test outline is being defined. The preparation steps are currently being executed and coordination is taking place with ES teams. Provided feedback on the InstaGENI documents, which have been addressed. Trying to schedule IG-ADM-4 with the InstaGENI team for March 4th, with the 5th as an alternate or a re-test date. These dates should work for Eldar and the GMOC. There are no blocking issues at this time. 21 20 22 23 21 __IG-ADM-5: Software Update Test__ ---> Expected Date: March 5 (March 11 alternate) [[BR]] 24 22 25 23 Nick to complete tests the current GENI-recommended versions of FV and FOAM by Friday March 1. Once Nick completes testing and InstaGENI Team requests site admins to upgrade, expect to run upgrade tests on March 4th. If we miss that date, March 11th is the last chance before GEC. 26 27 24 28 25 __IG-ADM-6: Control Network Disconnection Test__ ---> Expected Date: ??? [[BR]] … … 37 34 __IG-MON-1: Control Network Software and VLAN Inspection Test__ ---> Expected Date: ??? [[BR]] 38 35 39 40 41 36 __IG-ADM-5: Software Update Test__ ---> Expected Date: ??? [[BR]]