Changes between Version 8 and Version 9 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics


Ignore:
Timestamp:
02/27/13 09:45:30 (11 years ago)
Author:
Josh Smift
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics

    v8 v9  
    88Niky is modifying click router setup to run in two racks scenario. On 02/26 she was implementing click router environment workarounds.  Expect to be able to run test by Friday March 1.
    99
    10 
    1110=== Administrative Tests ===
    1211
    13 __IG-ADM-1: Rack Receipt and Inventory Test__   --->   Expected Date: March 13
     12__IG-ADM-1: Rack Receipt and Inventory Test__   --->   Expected Date: March 13  [[BR]]
    1413Only remaining blocker is government property tags.
    1514
     
    2019An Emergency Stop Procedure detailed test outline is being defined.  The preparation steps are currently being executed and coordination is taking place with ES teams. Provided feedback on the InstaGENI documents, which have been addressed. Trying to schedule IG-ADM-4 with the InstaGENI team for March 4th, with the 5th as an alternate or a re-test date. These dates should work for Eldar and the GMOC. There are no blocking issues at this time.
    2120
    22 
    2321__IG-ADM-5: Software Update Test__   --->   Expected Date:  March 5 (March 11 alternate) [[BR]]
    2422
    2523Nick to complete tests the current GENI-recommended versions of FV and FOAM by Friday March 1.  Once Nick completes testing and InstaGENI Team requests site admins to upgrade, expect to run upgrade tests on March 4th. If we miss that date, March 11th is the last chance before GEC.
    26 
    2724
    2825__IG-ADM-6: Control Network Disconnection Test__   --->   Expected Date: ??? [[BR]]
     
    3734__IG-MON-1: Control Network Software and VLAN Inspection Test__   --->   Expected Date: ???  [[BR]]
    3835
    39 
    40 
    4136__IG-ADM-5: Software Update Test__ --->   Expected Date: ???  [[BR]]