Changes between Version 6 and Version 7 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics


Ignore:
Timestamp:
02/27/13 09:39:08 (11 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics

    v6 v7  
    66
    77__IG-EXP-7: Click Router Experiment Acceptance Test__   --->   Expected Date: March 01  [[BR]]
    8 
    98Niky is modifying click router setup to run in two racks scenario. On 02/26 she was implementing click router environment workarounds.  Expect to be able to run test by Friday March 1.
    109
     
    1312
    1413__IG-ADM-1: Rack Receipt and Inventory Test__   --->   Expected Date: March 13
    15 
    1614Only remaining blocker is government property tags.
    1715   
    1816__IG-ADM-3: Full Rack Reboot Test__  --->   Expected Date: March 11 [[BR]]
    19 
    2017Need documentation by March 8th, would like to execute on March 11 [[BR]]
    2118
    2219__IG-ADM-4: Emergency Stop Test__   --->   Expected Date: March 4 (March 5th alternate) [[BR]]
    23 
    24 An Emergency Stop Procedure detailed test outline is being defined.  The preparation steps are currently being executed and soordination is taking place with ES teams. Provided feedback on the InstaGENI documents, which have been addressed. Trying to schedule IG-ADM-4 with the InstaGENI team for March 4th, with the 5th as an alternate or a re-test date. These dates should work for Eldar and the GMOC. There are no blocking issues at this time.
     20An Emergency Stop Procedure detailed test outline is being defined.  The preparation steps are currently being executed and coordination is taking place with ES teams. Provided feedback on the InstaGENI documents, which have been addressed. Trying to schedule IG-ADM-4 with the InstaGENI team for March 4th, with the 5th as an alternate or a re-test date. These dates should work for Eldar and the GMOC. There are no blocking issues at this time.
    2521
    2622