Changes between Version 1 and Version 2 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics


Ignore:
Timestamp:
02/27/13 09:32:09 (11 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/InstageniRacks/AcceptanceTestStatus/OpenTopics

    v1 v2  
    44
    55=== Experimenter Tests ===   
     6
    67__IG-EXP-7: Click Router Experiment Acceptance Test__   --->   Expected Date: March 01  [[BR]]
     8
    79Niky is modifying click router setup in two racks scenario, On 02/26 she was working on click router environment workarounds.
    810
     11
    912=== Administrative Tests ===
    10 _IG-ADM-1: Rack Receipt and Inventory Test__   --->   Expected Date: March 13
     13__IG-ADM-1: Rack Receipt and Inventory Test__   --->   Expected Date: March 13
    1114
    1215Only remaining blocker is government property tags.
    1316   
    14 __IG-ADM-3: Full Rack Reboot Test__  --->   Expected Date: March 11
     17__IG-ADM-3: Full Rack Reboot Test__  --->   Expected Date: March 11 [[BR]]
    1518
    16 Need documentation by March 8th, would like to execute on March 11.
     19Need documentation by March 8th, would like to execute on March 11 [[BR]]
    1720
    18 __IG-ADM-4: Emergency Stop Test__   --->   Expected Date: March 4 (March 5th alternate)
     21__IG-ADM-4: Emergency Stop Test__   --->   Expected Date: March 4 (March 5th alternate) [[BR]]
    1922
    2023An Emergency Stop Procedure detailed test outline is being defined.  The preparation steps are currently being executed and soordination is taking place with ES teams. Provided feedback on the InstaGENI documents, which have been addressed. Trying to schedule IG-ADM-4 with the InstaGENI team for March 4th, with the 5th as an alternate or a re-test date. These dates should work for Eldar and the GMOC. There are no blocking issues at this time.
    2124
    2225
    23 __IG-ADM-5: Software Update Test__   --->   Expected Date:  March 5 (March 11 alternate)
     26__IG-ADM-5: Software Update Test__   --->   Expected Date:  March 5 (March 11 alternate) [[BR]]
    2427
    2528Nick to complete tests the current GENI-recommended versions of FV and FOAM by Friday March 1.  Once Nick completes testing and InstaGENI Team requests site admins to upgrade, expect to run upgrade tests on March 4th. If we miss that date, March 11th is the last chance before GEC.
    2629           
    27 __IG-ADM-6: Control Network Disconnection Test__   --->   Expected Date: ???
     30__IG-ADM-6: Control Network Disconnection Test__   --->   Expected Date: ??? [[BR]]
    2831
    29 __IG-ADM-7: Documentation Review Test__   --->   Expected Date: ???
     32__IG-ADM-7: Documentation Review Test__   --->   Expected Date: ??? [[BR]]
    3033
    3134Prioritized outstanding documentation email on 01/31/2013. Waiting on responses.
     
    3336=== Monitoring Tests ===
    3437
    35 __IG-MON-1: Control Network Software and VLAN Inspection Test__   --->   Expected Date: ???
     38__IG-MON-1: Control Network Software and VLAN Inspection Test__   --->   Expected Date: ???  [[BR]]
    3639           
    37 __IG-ADM-5: Software Update Test__ --->   Expected Date: ???
     40__IG-ADM-5: Software Update Test__ --->   Expected Date: ???  [[BR]]