Changes between Version 4 and Version 5 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/IG-ADM-4


Ignore:
Timestamp:
02/15/13 10:23:01 (11 years ago)
Author:
tupty@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/InstageniRacks/AcceptanceTestStatus/IG-ADM-4

    v4 v5  
    4747The site administrator should review the Emergency Stop procedure provided by the GMOC as well as the InstaGENI sliver shutdown procedure.  The site administrator should identify parts of the procedure where they need to take action on the aggregate, and where they might need to interface with another party, such as the GMOC or an experimenter.  This parts identified by the site administrator should be verified with the GMOC and with the InstaGENI team.
    4848
    49 = Step 2: (prep) GPO, GMOC, and InstaGENI team coordinate a time to run an ES test =
     49= Step 2 (prep): GPO, GMOC, and InstaGENI team coordinate a time to run an ES test =
    5050
    5151The GPO will coordinate with parties at the GMOC and on the InstaGENI team to identify when an Emergency Stop test can be run.  This test will focus primarily on the interactions with the site administator(s) and performing the procedures documented by the rack team.  The following roles will need to be defined for this test: