    v33 v34  
    4646|| 5C         || [[Color(red,Fail)]]            || 2012-05-27           ||                    || the InstaGENI model does not include a "rack health" high-level UI                                                                                                                     ||
    4747|| 5D         || [[Color(yellow,Complete)]]     ||                      ||                    || requires re-testing after 1 is completed                                                                                                                                               ||
    48 || 6A         || [[Color(yellow,Complete)]]     ||                      ||                    || ([instaticket:43]) requires re-testing after 1 is completed                                                                                                                            ||
    49 || 6B         || [[Color(#63B8FF,In progress)]] ||                      ||                    || waiting for verification response from GMOC                                                                                                                                            ||
     48|| 6A         || [[Color(green,Pass)]]          ||                      ||                    || ([instaticket:43])                                                                                                                                                                     ||
     49|| 6B         || [[Color(green,Pass)]]          ||                      ||                    ||                                                                                                                                                                                        ||
    5050|| 6C         || [[Color(yellow,Complete)]]     ||                      ||                    || interim notifications during the test period have been agreed on; revisit longer-term plan for notifications later                                                                     ||
    5151
     
    784784 * I e-mailed GMOC, and will follow up when i get a response.
    785785
     786==== Results of testing step 6B: 2012-11-12 ====
     787
     788 * I iterated with Eldar at GMOC, and determined that GMOC has primary and escalation e-mail contacts for InstaGENI Utah, and that we determined that it isn't a requirement to have phone contacts if nothing appropriate exists.
     789
    786790=== Step 6C: Negotiate an interim change control notification procedure ===
    787791