Changes between Version 33 and Version 34 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/IG-ADM-1
- Timestamp:
- 11/12/12 12:32:07 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GENIRacksHome/InstageniRacks/AcceptanceTestStatus/IG-ADM-1
v33 v34 46 46 || 5C || [[Color(red,Fail)]] || 2012-05-27 || || the InstaGENI model does not include a "rack health" high-level UI || 47 47 || 5D || [[Color(yellow,Complete)]] || || || requires re-testing after 1 is completed || 48 || 6A || [[Color( yellow,Complete)]] || || || ([instaticket:43]) requires re-testing after 1 is completed||49 || 6B || [[Color( #63B8FF,In progress)]] || || || waiting for verification response from GMOC||48 || 6A || [[Color(green,Pass)]] || || || ([instaticket:43]) || 49 || 6B || [[Color(green,Pass)]] || || || || 50 50 || 6C || [[Color(yellow,Complete)]] || || || interim notifications during the test period have been agreed on; revisit longer-term plan for notifications later || 51 51 … … 784 784 * I e-mailed GMOC, and will follow up when i get a response. 785 785 786 ==== Results of testing step 6B: 2012-11-12 ==== 787 788 * I iterated with Eldar at GMOC, and determined that GMOC has primary and escalation e-mail contacts for InstaGENI Utah, and that we determined that it isn't a requirement to have phone contacts if nothing appropriate exists. 789 786 790 === Step 6C: Negotiate an interim change control notification procedure === 787 791