Changes between Version 27 and Version 28 of GENIRacksHome/InstageniRacks/AcceptanceTestStatus/IG-ADM-1
- Timestamp:
- 07/04/12 15:15:24 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GENIRacksHome/InstageniRacks/AcceptanceTestStatus/IG-ADM-1
v27 v28 47 47 || 5D || [[Color(yellow,Complete)]] || || || requires re-testing after 1 is completed || 48 48 || 6A || [[Color(orange,Blocked-site)]] || || [instaticket:43] || blocked on InstaGENI operators subscribing to response-team || 49 || 6B || || || || ready to test||49 || 6B || [[Color(#63B8FF,In progress)]] || || || waiting for verification response from GMOC || 50 50 || 6C || [[Color(yellow,Complete)]] || || || interim notifications during the test period have been agreed on; revisit longer-term plan for notifications later || 51 51 … … 758 758 759 759 '''Verify:''' 760 * Browse to [https://gmoc-db.grnoc.iu.edu/protected/], login, and look at the "organizations" table. Make sure either: 761 * The Utah contact information is up-to-date and includes instageni-ops and some reasonable phone numbers 762 * A new InstaGENI contact has been added 760 * E-mail `gmoc@grnoc.iu.edu` and request verification that the InstaGENI organization contact info is up-to-date. 761 762 ==== Results of testing step 6B: 2012-07-04 ==== 763 764 * I e-mailed GMOC, and will follow up when i get a response. 763 765 764 766 === Step 6C: Negotiate an interim change control notification procedure ===