Changes between Version 51 and Version 52 of GENIRacksHome/ExogeniRacks


Ignore:
Timestamp:
11/07/12 12:23:05 (12 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/ExogeniRacks

    v51 v52  
    3737== Rack Deployment ==
    3838
    39 The GPO works with Campus Engineering and the ExoGENI Rack Team to set up and coordinate testing of the control, !OpenFlow, and campus  connections, as well as site monitoring. An outline of the '''[wiki:GENIRacksHome/RacksChecklist GENI Rack Site Installation Checklist]''' is available that is a baseline for the ExoGENI site installation.
     39The GPO works with Campus Engineering and the ExoGENI Rack Team to set up and coordinate testing of the control, !OpenFlow, and campus  connections, as well as site monitoring for the [http://groups.geni.net/geni/wiki/GENIRacksHome/GENIRacksDeploymentSites ExoGENI Deployment Sites]. An outline of the '''[wiki:GENIRacksHome/RacksChecklist GENI Rack Site Installation Checklist]''' is available that is a baseline for the ExoGENI site installation.
    4040
    4141The GPO also executed '''[wiki:GENIRacksHome/ExogeniRacks/SiteConfirmationTests ExoGENI New Site Confirmation Tests]''' to validate the introduction of each new ExoGENI site.