Changes between Version 7 and Version 8 of GENIRacksHome/ExogeniRacks/AcceptanceTestStatus/OpenTopics
- Timestamp:
- 02/27/13 08:32:28 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GENIRacksHome/ExogeniRacks/AcceptanceTestStatus/OpenTopics
v7 v8 1 == ExoGENI Acceptance Tests Open Topic ==1 == ExoGENI Acceptance Tests Open Topics == 2 2 3 3 == Open Topics: 2013-02-27 == … … 6 6 7 7 __Overall for Experimenter tests:__ ---> Expected Date: ??? [[BR]] 8 Waiting on installation for AM API fix in all racks, to re-r an experimenter acceptance tests.8 Waiting on installation for AM API fix in all racks, to re-run experimenter acceptance tests. 9 9 10 10 __EG-EXP-3: ExoGENI Single Site 100 VM Test__ ==> Expected Date: After GEC16 [[BR]] … … 15 15 __EG-ADM-2: Rack Administrator Access Test__ ==> Expected Date:__ ??? [[BR]] 16 16 17 There are concerns about the current ExoGENI Network Design, and following17 There are concerns about the current ExoGENI Control Network, and following 18 18 are requests to address our concerns: 19 19 20 1. We think site admins will find it surprising and alarming that part20 1. We think site admins will find it surprising and possibly alarming that part 21 21 of their network (vlan 1006) is being bridged to control networks 22 22 at other sites. It should be documented clearly for site admins 23 that this is going on.23 that this is the case. 24 24 25 25 2. We think the IMMs at each site should have per-site nontrivial 26 passwords (the ones at BBN are still USERID/PASSW0RD), so that26 passwords (the ones at BBN are still trivial for example), so that 27 27 accidental tampering with other sites' nodes is less likely. 28 28 29 29 3. We think site admins shouldn't be able to login to other sites' 30 30 head nodes. This is a bit of extra protection against accidents 31 which should be easy to implement.31 which we think should be easy to implement. 32 32 33 33 … … 36 36 An Emergency Stop Procedure detailed test outline is being defined. The preparation 37 37 steps are currently being executed and Coordination is taking place. There are no 38 blocking issues at t ime.38 blocking issues at this time. 39 39 40 40 … … 42 42 43 43 Email with prioritized documentation list was sent to the exogeni-design list. We would like to see 44 some progress on the high priority items .44 some progress on the high priority items before GEC. 45 45 46 46 === Monitoring Tests === 47 47 48 48 __EG-MON-3: GENI Active Experiment Inspection Test__ ==> Expected Date: March 1-8 prep, March 11-? execution. [[BR]] 49 Currently learning the Pequod interface, ramp up time is only issue.49 GPO staff currently learning the Pequod interface, ramp up time is only issue. 50 50 51 51 __EG-MON-5: GMOC Data Collection Test__ ==> Expected Date: [[BR]]