    1 == ExoGENI Acceptance Tests Open Topic ==
     1== ExoGENI Acceptance Tests Open Topics ==
    22
    33== Open Topics: 2013-02-27 ==
     
    66
    77__Overall for Experimenter tests:__   --->   Expected Date: ???  [[BR]]
    8 Waiting on installation for AM API fix in all racks, to re-ran experimenter acceptance tests.
     8Waiting on installation for AM API fix in all racks, to re-run experimenter acceptance tests.
    99
    1010__EG-EXP-3: ExoGENI Single Site 100 VM Test__  ==> Expected Date: After GEC16  [[BR]]
     
    1515__EG-ADM-2: Rack Administrator Access Test__  ==> Expected Date:__ ???  [[BR]]
    1616
    17 There are concerns about the current ExoGENI Network Design, and following
     17There are concerns about the current ExoGENI Control Network, and following
    1818are requests to address our concerns:
    1919
    20  1. We think site admins will find it surprising and alarming that part
     20 1. We think site admins will find it surprising and possibly alarming that part
    2121    of their network (vlan 1006) is being bridged to control networks
    2222    at other sites.  It should be documented clearly for site admins
    23     that this is going on.
     23    that this is the case.
    2424
    2525 2. We think the IMMs at each site should have per-site nontrivial
    26     passwords (the ones at BBN are still USERID/PASSW0RD), so that
     26    passwords (the ones at BBN are still trivial for example), so that
    2727    accidental tampering with other sites' nodes is less likely.
    2828
    2929 3. We think site admins shouldn't be able to login to other sites'
    3030    head nodes.  This is a bit of extra protection against accidents
    31     which should be easy to implement.
     31    which we think should be easy to implement.
    3232 
    3333
     
    3636An Emergency Stop Procedure detailed test outline is being defined.  The preparation
    3737steps are currently being executed and Coordination is taking place. There are no
    38 blocking issues at time.
     38blocking issues at this time.
    3939 
    4040
     
    4242
    4343Email with prioritized documentation list was sent to the exogeni-design list.  We would like to see
    44 some progress on the high priority items.
     44some progress on the high priority items before GEC.
    4545
    4646=== Monitoring Tests ===
    4747
    4848__EG-MON-3: GENI Active Experiment Inspection Test__   ==> Expected Date: March 1-8 prep, March 11-? execution.  [[BR]]
    49 Currently learning the Pequod interface, ramp up time is only issue.
     49GPO staff currently learning the Pequod interface, ramp up time is only issue.
    5050
    5151__EG-MON-5: GMOC Data Collection Test__   ==> Expected Date:  [[BR]]