Changes between Version 12 and Version 13 of GENIRacksHome/ExogeniRacks/AcceptanceTestStatus/OpenTopics


Ignore:
Timestamp:
02/27/13 09:10:59 (11 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/ExogeniRacks/AcceptanceTestStatus/OpenTopics

    v12 v13  
    3434__EG-ADM-4: Emergency Stop Test__ ---> Expected Date: Match 6 (March 7 alternate)  [[BR]]
    3535
    36 An Emergency Stop Procedure detailed test outline is being defined.  The preparation
    37 steps are currently being executed and Coordination is taking place. There are no
    38 blocking issues at this time.
     36An Emergency Stop Procedure detailed test outline is being defined.  The preparation steps are currently being executed and Coordination is taking place. There are no blocking issues at this time.
    3937 
     38Working on reviewing the document that ExoGENI provided, and will send them feedback today.  Trying to schedule EG-ADM-4
     39with the ExoGENI team for March 6th, with the 7th as an alternate or a retest date.  These dates should work for Eldar and the GMOC.
     40
     41
    4042
    4143__EG-ADM-7: Documentation Review Test__  ---> Expected Date: ???  [[BR]]