Changes between Version 21 and Version 22 of GENIRacksHome/ExogeniRacks/AcceptanceTestStatus/EG-EXP-3
- Timestamp:
- 12/06/12 13:31:59 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GENIRacksHome/ExogeniRacks/AcceptanceTestStatus/EG-EXP-3
v21 v22 113 113 114 114 == Step 6. Log into several of the VMs, and send traffic to several other systems. == 115 115 Was able to login to some nodes after the slivers were ready. 116 116 117 == Step 7. Step up traffic rates to verify VMs continue to operate with realistic traffic loads. == 117 118 … … 121 122 122 123 == Step 8. Verify that several VMs running on the same worker node have a distinct MAC address for their interface. == 124 Allocated VMs have unique MAC addresses. 123 125 124 126 == Step 9. Verify for several VMs running on the same worker node, that their MAC addresses are learned on the data plane switch. == 125 127 128 The successful exchange of traffic on the dataplane interface shows that are learned on data plane switch. 129 126 130 == Step 10. Review monitoring statistics and check for resource status for CPU, disk, memory utilization, interface counters, uptime, process counts, and active user counts. == 127 131 This step is replaced by iperf for ExoGENI test cases. Not yet completed during scalability tests. 132 128 133 == Step 11. Stop traffic and delete sliver. == 129 134 Slivers are deleted as follows throughout testing: 135 {{{ 136 $ omni.py deletesliver -a eg-sm EG-EXP-3 137 $ omni.py deletesliver -a eg-bbn EG-EXP-3 138 }}} 139 140 == Step 12. Re-execute procedure in steps 1-11 with changes required for Test 1: 10 slivers with 10 VMs each == 141 142 == Step 13. Re-execute procedure in steps 1-11 with changes required for Test 2: 4 slivers w/20VMS +2 slivers w/10 VMs == 143 144 == Step 14. Re-execute procedure in steps 1-11 with changes required for Test 3: 20 slivers with 5 VMs each == 145 146 == Step 14. Re-execute procedure in steps 1-11 with changes required for Test 4: 100 Sliver with 1 VM == 147 148 == Step 14. Re-execute procedure in steps 1-11 with changes required for Test 5: 1 slivers with 100 VMs == 149 150 == Step 14. Re-execute procedure in steps 1-11 with changes required for Test 6: 2 slivers with 50 VMs each == 151