Changes between Version 7 and Version 8 of GENIRacksHome/ExogeniRacks/AcceptanceTestStatus/EG-ADM-4


Ignore:
Timestamp:
03/01/13 17:07:58 (11 years ago)
Author:
tupty@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/ExogeniRacks/AcceptanceTestStatus/EG-ADM-4

    v7 v8  
    2222
    2323|| '''Step''' || '''State'''                    || '''Date completed''' || '''Open Tickets''' || '''Closed Tickets/Comments''' ||
    24 || 1          || [[Color(#63B8FF,In Progress)]] ||                      ||                    || tupty has reviewed GMOC doc and EG doc, waiting on approval for GPO doc ||
     24|| 1          || [[Color(green,Pass)]]          || 2013-03-01           ||                    || tupty has reviewed GMOC doc and EG doc, GPO doc has been posted ||
    2525|| 2          || [[Color(green,Pass)]]          || 2013-02-28           ||                    || test has been scheduled, roles have been defined ||
    2626|| 3          ||                                ||                      ||                    ||   ||
     
    5252
    5353The site administrator should review the local site ES procedure, the ES procedure provided by the GMOC, and the ExoGENI sliver shut down procedure.  All of these procedures should make sense together, and the site administrator should follow the local site ES procedure for the test.  The site administrator should identify parts of the local procedure where they need to take action on the aggregate, and they should reference the ExoGENI sliver shut down procedure for that part of the test.  He or she should also identify where the local site procedure requires interfacing with the GMOC.  The parts identified by the site administrator should be verified with the GMOC and with the ExoGENI team.
     54
     55== Results of testing step 2: 2013-03-01 ==
     56The documents have been collected, and they are at the following locations:
     57 * Local site ES procedure: http://groups.geni.net/geni/wiki/EmergencyStop#ExampleProcedureforSiteOperatorResponsetoEmergencyStopRequest
     58 * GMOC ES procedure: http://gmoc.grnoc.iu.edu/gmoc/index/documents/geni-proposals/gmoc-noc-support-spiral-4-emergency-stop-workflow.html
     59 * ExoGENI sliver shut down procedure: https://wiki.exogeni.net/doku.php?id=private:operation:emergency_stop
    5460
    5561= Step 2 (prep): GPO, GMOC, and ExoGENI team coordinate a time to run an ES test =