Changes between Version 23 and Version 24 of GENIRacksHome/AcceptanceTests/ExogeniAcceptanceTestsPlan


Ignore:
Timestamp:
10/07/13 15:37:26 (10 years ago)
Author:
lnevers@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GENIRacksHome/AcceptanceTests/ExogeniAcceptanceTestsPlan

    v23 v24  
    66
    77The GPO infrastructure team will perform the tests described in this page and the GPO software team will run the software acceptance tests in cooperation with the ExoGENI rack team.   
    8 The GPO will execute all of this test plan for the first two ExoGENI racks delivered on the GENI network (GPO and RENCI).  The ExoGENI acceptance test effort will capture findings and unresolved issues, which will be published in an Acceptance Test Report.  GENI operations (beginning with the GPO) will run a shorter version of the acceptance tests for each subsequent site installed.  Issues from site installation tests will be tracked in operations tickets.
     8The GPO will execute all of this test plan for the first two ExoGENI racks delivered on the GENI network (GPO and RENCI).  The ExoGENI acceptance test effort will capture findings and unresolved issues, which will be published in an Acceptance Test Report.  GENI operations (beginning with the GPO) will run a shorter version of the acceptance tests for each subsequent site installed.  Issues from site installation tests will be tracked in operations tickets. See the '''[wiki:GENIRacksHome/ExogeniRacks/AcceptanceTestStatus ExoGENI Acceptance Test Status]''' page for details about the current status.
    99 
    1010== Assumptions and Dependencies ==