Changes between Version 27 and Version 28 of GEMINIv2tasks
- Timestamp:
- 05/28/13 14:13:07 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEMINIv2tasks
v27 v28 160 160 || 2a || /cleanup/check in/test/document current code || Ezra ||4/30/13 || Completed || || Code and documentation leading to GEC16 has been checked in. || 161 161 || 2C || Desktop Browser support- additional testing/planned set of browsers || UK- Charles || || Complete || || MAC: Firefox, Chrome, Safari, Opera(Flash logon fails) WIN: Firefox, Chrome, IE (Flash logon fails, auto logon drupal pages fail (this is being changed anyway), mixed http/https content stops page). All: Chrome has issues with secure content parts of the page, may not be obvious to user how to proceed by clicking on grayed out shield. 5/28/13- Firefox and Chrome are working (will put at the bottom of the page which browsers are supported). || 162 || 4 || Build workflow for GEMINI to work on both InstaGENI and ExoGENI || Ezra, Hussam, Jeanne || || 4/30: fair || 5/14 (on ExoGENI) || 4/30: fair, but still some manual steps; lots of changes in instrumentize script; using Centos image on ExoGENI ||162 || 4 || Build workflow for GEMINI to work on both InstaGENI and ExoGENI || Ezra, Hussam, Jeanne || || 4/30: fair || 5/14 (on ExoGENI) || 4/30: fair, but still some manual steps; lots of changes in instrumentize script; using Centos image on ExoGENI 5/28/13- Started on the ExoGENI part. ExoGENI is down until Friday 5/31/13 so UK will be back working on this next week. || 163 163 || 5 || Add features to GEMINI Portal (GENI Desktop) service: || || || || || || 164 164 || 5c || Push topology to UNIS, then retrieve topology from UNIS for display || Ahmed, Ezra, Hussam || || In Progress || || 4/16: Ezra sends proposal, some discussion, plan to stay with current plan. 4/30: Still plan to stay with current plan, separate topology data; need to make sure the topology is consistent and getting updated; some concern with when slice modifications happen. ||