Version 14 (modified by 12 years ago) (diff) | ,
---|
GEMINI v1.1 Design Topics
Task List and Status
Legend |
Color(green,Complete)? |
Color(#B0E0E6, In Progress)? |
Color(yellow, Blocked)? |
Color(#FF6600, "Won't Fix")? |
Not Started |
No | Task | Owner | Due | Status | Notes |
1 | Repackage Global Node code for VM OS (Fedora 15) | Matt/Hussma and Jeanne | Color(#B0E0E6, In Progress)? | On 9/28, Jeanne still has issues. | |
2 | Check into building images for InstaGENI, and decide if a call with Utah would help | Hussam/Jeremy and Harry/Luisa/Jeanne | Color(green, Complete)? | Luisa provided instructions. On 9/28, Jeanne will start email with Jeremy and Luisa to resolve | |
3 | Write a short description of a reference experiment based on Phoebus/XSP | Ezra | Color(green,Complete)? | On 9/14, completed; see document | |
3b | Describe an alternate reference experiment, that generates and manipulates traffic | Jim | Color(#B0E0E6, In Progress)? | On 9/28, pieces are working, will demo on 10/5 | |
3c | Provide story board and reference workflow for experiments/tutorials | Jeanne/Harry | Color(green,Complete)? | On 9/21, reviewed; see story board and document | |
3d | Need to agree on having GEMINI GEC15 tutorial follow steps in the reference workflow | Jeanne/Harry and team | Color(#B0E0E6, In Progress)? | 9/28, some review; agree on 10/5 | |
3e | Need to decide if tutorial will use only InstaGENI rack, or must also include ProtoGENI clusters | Team | Color(green,Complete)? | on 9/28, agree InstaGENI rack unstable; likely only ProtoGENI, UK preferred | |
3f | Need to identify owner of workflow for GEMINI GEC15 tutorial | Team | Color(#B0E0E6, In Progress)? | Agree on 10/5 | |
4 | Check into how we might clean up push/pull to/from UNIS | Ezra | Color(green,Complete)? | On 9/13, Possible solution is to make LAMP GUI unavailable until every node checks in, but not sure it is worth the effort; defer. | |
5 | Sketch the flow between elements of the new structure to be introduced at GEC15 | Ezra | Color(green,Complete)? | On 9/21, reviewed sketch; see document | |
6 | Merging development branches of GEMINI code | Ezra/Omer/Ahmed/Matt | 9/14? | Color(green,Complete)? | Merging is happening in private repository, hope to have completed by 9/21 |
7 | Organize GENI ABAC status review | Harry | Color(green,Complete)? | On 8/30. completed; see document | |
7b | Explain AA use in new clearinghouse | Harry | Color(#B0E0E6, In Progress)? |
8 | Define authentication and authorization (AA) workflow in GEMINI for various use cases | Ezra/Ahmed | Color(#B0E0E6, In Progress)? | On 9/21, explained; see configuration and document; next step is to integrate with UNIS and try transaction; on 9/28, see status; still in target for GEC15 | |
9 | Current user email list does not work for outside users | Jeanne | Color(green,Complete)? | On 9/14, Jeanne to setup Google Groups list | |
10 | Need to revisit source control plan | Jeanne | Color(#B0E0E6, In Progress)? | On 9/21, presented current view in drawing; see document; on 9/28, GEMINI portal repository in progress, to Github, like INSTOOLS |