Changes between Version 4 and Version 5 of GEMINIv1.1IntegrationTasks


Ignore:
Timestamp:
09/26/12 19:28:28 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEMINIv1.1IntegrationTasks

    v4 v5  
    55=== Task List and Status ===
    66
    7 || '''Legend''' ||
    8 ||  [[Color(green,Complete)]] ||
    9 ||  [[Color(#B0E0E6, In Progress)]]  ||
    10 ||  [[Color(yellow, blocked)]] ||
    11 ||  [[Color(#FF6600, "Won't Fix")]] ||
    12 ||  Not Started ||
    13 
    14 [[BR]]
     7These tasks are based on the [http://groups.geni.net/geni/wiki/GEMINIIntegrationTasks#GEMINIv1.0IntegrationPlan GEMINI v1.0 Integration Plan]:
    158
    169|| '''ID''' || ''' Task ''' || '''Owner''' || '''Due''' || '''Status''' || ''' Notes''' ||
    17 ||  1 || Repackage active network measurements code for Fedora 15 ||  Matt ||  ||  [[Color(#B0E0E6, In Progress)]] ||  Jeanne tested the script emailed on 9/10.  Matt is working on fixes. ||
    18 ||  2 || Check into building images for InstaGENI, and decide if a call with Utah would help || Harry/Jeanne/Luisa ||  ||  [[Color(green, Complete)]] ||  Luisa provided instructions.  Need to try these.  ||
    19 ||  3 || Write a short description of the reference experiment based on Phoebus/XSP || Ezra ||   || [[Color(green,Complete)]] || [attachment:gemini_phoebus.txt gemini_phoebus.txt] ||
    20 ||  4 || Check into how we might clean up push/pull to/from UNIS || Ezra || || [[Color(#B0E0E6, In Progress)]]  || ||
    21 ||  5 || Sketch the flow between elements of the new structure to be introduced at GEC15 || Ezra || || [[Color(#B0E0E6, In Progress)]]  || ||
    22 ||  6 || Merging development branches of GEMINI code || Ezra and Omer || 9/14?  || [[Color(#B0E0E6, In Progress)]] || Merging is happening in private repository ||
    23 ||  7 || organize GENI ABAC status review || Harry || || [[Color(green,Complete)]] || ||
    24 ||  8 || define authentication and authorization workflow in GEMINI for various use cases || Ezra and Ahmed || || [[Color(#B0E0E6, In Progress)]]  || ||
    25 ||  9 || determine new plan for public user email list ||  ||  ||  || only public option seems to be fully moderated list ||
    26 || 10 || revisit source control plan || Jeanne || || || ||
    27                                                                
     10||  1.1 || User workspace VM ||  Jeanne || 5/23 || [[Color(green,Complete)]] || See [http://groups.geni.net/geni/wiki/GENIUserWorkspace] for instructions ||
     11|| 1.2 || Find reference experiment || Ezra ||  || [[Color(#B0E0E6, In Progress)]] 5% || Ezra will try using XSP and prepare instructions ||
     12|| 1.3 || Document reference cases || Jeanne || 5/23 || [[Color(green,Complete)]] || [http://groups.geni.net/geni/wiki/GEMINITestPlan#GEMINIv1.0Matrix] ||
     13|| 1.4 || Specify and document rspec extensions || Hussam || 5/23 || [[Color(green,Complete)]] || [http://groups.geni.net/geni/wiki/GEMINIIntegrationTasks#RSpecExtensions] ||
     14|| 2.1 || Issue tracker || Jeanne || 5/23 || [[Color(green, Complete)]] || [http://groups.geni.net/gemini] ||
     15|| 3.1 || Move Old UNIS to IU || Guilherme || 5/23 || [[Color(green,Complete)]] || https://unis.incntre.iu.edu:8012/perfSONAR_PS/services/unis ||
     16|| 3.2 || Move LAMP CA to IU || Guilherme || 5/23 || [[Color(green,Complete)]] || https://unis.incntre.iu.edu/protogeni/xmlrpc/lampca ||
     17|| 3.3 || iRODS at UK || Hussam || 5/23 || [[Color(green,Complete)]] || [https://irodwes.netlab.uky.edu/irodsweb] ||
     18|| 3.4 || GEMINI Portal at UK || Charles || 5/23 || [[Color(green, Complete)]] ||  [http://geminiportal.netlab.uky.edu] ||
     19|| 4.1 || Bug fixes on current perfSONAR modules || Guilherme || 6/6 || [[Color(green,Complete)]] || ||
     20|| 4.2 || Package and install perfSONAR modules || Guilherme || 6/6 || [[Color(green,Complete)]] ||  ||
     21|| 4.3 || Separate entry into presentation GUI || Guilherme || 6/6 || [[Color(green,Complete)]] ||  ||
     22|| 4.4 || Verify reference cases || Guilherme || 6/6 || [[Color(#B0E0E6, In Progress)]] || ||
     23|| 5.1 || Bug fixes on current INSTOOLS modules || Hussam || 6/6 || [[Color(green,Complete)]] || ||
     24|| 5.2 || Package INSTOOLS  modules || Hussam || 6/6 || [[Color(green,Complete)]] || ||
     25|| 5.3 || Installation script for INSTOOLS modules || Hussam || 6/6 || [[Color(green,Complete)]] || ||
     26|| 5.5 || Verify reference cases || Hussam || 6/6 || [[Color(#B0E0E6, In Progress)]] ||  ||
     27|| 6.1 || Integrate PS and INSTOOLS module installation scripts || Hussam and Guilherme || 6/20 || [[Color(green,Complete)]] || ||
     28|| 6.2 || Verify reference cases for both active and passive together || Hussam and Guilherme || 6/20 || [[Color(#B0E0E6, In Progress)]] || ||
     29|| 6.3 || Extend iRODS script to include perfSONAR data || Guilherme || 6/20 || [[Color(#FF6600, "Won't Fix")]] || Will be done for the new architecture after GEC 14. ||
     30|| 7.1 || Define acceptance test plan || Jeanne || 6/20 || [[Color(green,Complete)]] || ||
     31|| 7.2 || Execute acceptance tests || Jeanne || 6/20 || [[Color(#B0E0E6, In Progress)]] 75% || Executed instrumentize script, passive and active meas. [[BR]] Executed existing iRODS functionality [[BR]] No reference experiment ||
     32|| 8.1 || Coordinate tutorial with earlier tutorial || Harry || 7/4 || [[Color(green, Complete)]] || Conf call with Rob Ricci on 6/21 ||
     33|| 8.2 || Define use cases and reference experiments to be included ||  Ezra?  || 7/4 || [[Color(#B0E0E6, In Progress)]] || ||
     34|| 8.3 || Identify tutorial roles || || 7/4 ||  [[Color(#B0E0E6, In Progress)]] || ||
     35|| 8.4 || Prepare tutorial VM || Jeanne || 7/4 ||  [[Color(green, Complete)]] ||   ||
     36|| 8.5 || Prepare materials || || 7/4 ||  Not Started || ||
    2837
    2938
     39=== Modules and Scripts ===
    3040
    31    
     41|| '''Module''' || '''Owner''' || '''Status''' ||
     42|| Old psConfig || Guilherme || Ready ||
     43|| Old UNIS || Guilherme || Ready ||
     44|| Bootstrap script || Hussam || ||
     45|| Service watcher || Guilherme || Ready ||
     46|| PSBuoy/PINGER || Guilherme || Ready ||
     47|| Drupal CMS || Charles || ||
     48|| GEMINI Portal || Charles || ||
     49|| perfSONAR Config Portal || Guilherme || Ready ||
     50|| !PerfAdmin (Presentation) || Guilherme || Ready ||
     51
     52=== Deliverables ===