409 | | == 11) Coordinate configurations to provide make active network measurements and to collect basic host metrics == |
410 | | |
411 | | |
412 | | a) For GEC13, LAMP and INSTOOLS code was both loaded; portal was pointed to both GUIs |
413 | | |
414 | | b) Need to agree on strategy for GEC14: load both types of code? is there any chance of a unified set of tools? |
| 409 | == 11) Strategy to support multiple configurations in one slice == |
| 410 | |
| 411 | a) Need plan to coordinate configurations to provide make active network measurements and to collect basic host metrics in the same slice |
| 412 | |
| 413 | b) For GEC13, LAMP code and INSTOOLS code were both loaded; portal was pointed to both GUIs |
| 414 | |
| 415 | c) Need to agree on strategy for GEC14: load both types of code? is there any chance of a unified set of tools? |
| 416 | |
| 417 | d) Long term strategy: unified set of tools |