ID Task Owner Due Status
1.1 User workspace VM Jeanne 5/23 In Progress 25%
1.2 Find reference experiment Jeanne 5/23 In Progress 5%
1.3 Document reference cases 5/23
1.4 Specify and document rspec extensions 5/23
2.1 Issue tracker Jeanne 5/23 In Progress 75%
3.1 New UNIS at IU 5/23
3.2 Move Old UNIS to IU 5/23
3.3 Move LAMP CA to IU 5/23
3.4 iRODS at UK Hussam 5/23
3.5 GEMINI Portal at UK Charles 5/23
4.1 Complete modules 6/6
4.2 Package active network measurement (ANM) modules 6/6
4.3 Separate entry into presentation GUI 6/6
4.4 Installation script for ANM modules 6/6
4.5 Verify reference cases 6/6
5.1 Complete modules 6/6
5.2 Package passive host measurement (PHM) modules 6/6
5.3 Installation script for PHM modules 6/6
5.4 Add ability to verify config ? 6/6
5.5 Verify reference cases 6/6
6.1 Integrate ANM and PHM module installation scripts 6/20
6.2 Verify reference cases for both ANM and PHM together 6/20
7.1 Define acceptance test plan Jeanne 6/20 In Progress 60%
7.2 Execute acceptance tests Jeanne 6/20 Not Started
8.1 Coordinate tutorial with earlier tutorial 7/4
8.2 Define use cases and reference experiments to be included 7/4
8.3 Identify tutorial roles 7/4
8.4 Prepare tutorial VM 7/4
8.5 Prepare materials 7/4

Modules and scripts

New psConfig
New UNIS
Old UNIS to New UNIS translator
MS
Bootstrap script (instrumentize?)
Service watcher
PSBuoy/PINGER
PeriViz
Drupal CMS
PerfAdmin (Config and Presentation)
UNIS Encoder

Attachments (2)

Download all attachments as: .zip