wiki:GEC6InstMeasWGAgenda

Version 8 (modified by hmussman@bbn.com, 14 years ago) (diff)

--

The Instrumentation and Measurement Working Group met at GEC6:

Wednesday, November 18, 9am - 11am

The agenda included:

Welcome and introduction:

Paul Barford, University of Wisconsin, WG Chair

Initial view of WG Goals for Spiral 2: (5min)

Paul Barford, University of Wisconsin, WG Chair

Short presentations by Spiral 2 projects involving instrumentation and measurement design and prototyping:

Instrumentation and Measurement for GENI (1628) PI: Barford

Instrumentation Tools for a GENI Prototype (1642) PI: Griffioen

OnTimeMeasure: Centralized and Distributed Measurement Orchestration Software (1764) PI: Calyam

Leveraging and Abstracting Measurements with perfSONAR (LAMP)(1788) PI: Swany

Scalable, Extensible, and Safe Monitoring of GENI (1723) PI: Fahmy

Virtual Machine Introspection and Development of a Model Federation Framework for GENI (1773) PI: Nance

Embedding real-time substrate measurements for cross-layer communications (1631) PI: Bergman

Integrated Measurement Framework and Tools for Cross Layer Experimentation (1718) PI: Dutta

ORBIT, including a good measurements arrangement, as part of OMF (1660) PI: Gruteser

Discussion to refine view of WG Goals for Spiral 2:

Paul Barford, University of Wisconsin, WG Chair

Wrap up, review of action items and issues for plenary Harry Mussman - GPO, WG SE

Attachments (12)