Changes between Version 34 and Version 35 of GEC6InstMeasWGAgenda


Ignore:
Timestamp:
11/18/09 19:36:59 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC6InstMeasWGAgenda

    v34 v35  
    1010 [http://groups.geni.net/geni/attachment/wiki/GEC6InstMeasWGAgenda/geni_imwg_11_09.pdf  slides]
    1111
    12 9:20am  Short presentations by Spiral 2 projects involving instrumentation and measurement design and prototyping: (60min)
     12Short presentations by Spiral 2 projects involving instrumentation and measurement design and prototyping, including:  1) title and team, 2) Spiral 2 objectives, 3) challenges, and 4) proposed approach  (approx 7min) [[BR]]
    1313
    14 Each project will present four slides: (approx 7min)
    15 1) title and team, 2) Spiral 2 objectives, 3) challenges, and 4) proposed approach
    16 
    17  [http://groups.geni.net/geni/wiki/MeasurementSystem    Instrumentation and Measurement for GENI (1628)] PI: Paul Barford
     14 [http://groups.geni.net/geni/wiki/MeasurementSystem    Instrumentation and Measurement for GENI (1628)] PI: Paul Barford  [http://groups.geni.net/geni/attachment/wiki/GEC6InstMeasWGAgenda/geni_gims_11_17.pdf  slides]
    1815
    1916 [http://groups.geni.net/geni/wiki/InstrumentationTools  Instrumentation Tools for a GENI Prototype  (1642)]  PI:  James Griffioen