Changes between Version 1 and Version 2 of GEC6InstMeasWGAgenda


Ignore:
Timestamp:
11/04/09 10:38:40 (14 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC6InstMeasWGAgenda

    v1 v2  
    1212
    1313
    14 Initial view of WG Goals for Spiral 2: (5min)
     143)  Here is the current list of projects directly involving instrumentation and measurement design and prototyping:
     15
     16
     171628  Barford  Instrumentation and Measurement for GENI  http://groups.geni.net/geni/wiki/MeasurementSystem
     18
     191642  Grif?oen Instrumentation Tools for a GENI Prototype  http://groups.geni.net/geni/wiki/InstrumentationTools
     20
     211764  Calyam  OnTimeMeasure: Centralized and Distributed Measurement Orchestration Software   http://groups.geni.net/geni/wiki/OnTimeMeasure
     22
     231788  Swany  Leveraging and Abstracting Measurements with perfSONAR (LAMP)  http://groups.geni.net/geni/wiki/LAMP 
     24
     251723  Fahmy  Scalable, Extensible, and Safe Monitoring of GENI http://groups.geni.net/geni/wiki/ScalableMonitoring
     26
     271773  Nance  Virtual Machine Introspection and Development of a Model Federation Framework for GENI  http://groups.geni.net/geni/wiki/VMI-FED 
     28
     291631  Bergman  Embedding real-time substrate measurements for cross-layer communications  http://groups.geni.net/geni/wiki/Embedded%20Real-Time%20Measurements
     30
     311718  Dutta  Integrated Measurement Framework and Tools for Cross Layer Experimentation  http://groups.geni.net/geni/wiki/IMF
     32
     33
     344)  this project has a very good measurements arrangement, as part of OMF:
     35
     361660  Gruteser  ORBIT  http://groups.geni.net/geni/wiki/ORBIT 
     37
    1538
    1639