Version 1 (modified by 15 years ago) (diff) | ,
---|
The Substrate Working Group will meet:
Tuesday 7/21 3:30pm - 5:30pm
The PRELIMINARY agenda includes:
1) Welcome and introduction of new co-chair(s), effective GEC6
Joe Evans and Peter O'Neil, WG co-chairs
2) Review of recent vertical and horizontal integration examples:
a) ORCA integration with BEN, including cross layer setup in
BEN, and setup of VLANs through BEN and NLR (stitching) (20 min)
Yufeng Xin - RENCI
b) ORBIT (OMF) integration with a WiMAX base station into
ORBIT (vertical integration) and plans to connect WINLAB and NICTA sites via I2, etc. (horizontal integration) (20 min)
Ray Raychaudhuri - WINLAB/Rutgers
c) PlanetLab GENI integration with DRAGON resources in MAX (vertical integration), and using DRAGON to make connections across multiple entities (horizontal integration) (20 min) Chris Tracy - MAX, incoming co-chair
3) Introduction to UltraScience Net (15 min)
Nagi Rao - Oak Ridge National Laboratory
4) WG Goals for Spiral 2 (10 min)
Joe Evans and Peter O'Neil, WG co-chairs
5) Wrap up, review of action items and issues for plenary
Christopher Small - GPO (standing in for Harry Mussman, WG SE)
Attachments (5)
- GEC5-xin-substrate-wg.pdf (2.6 MB) - added by 15 years ago.
- Agenda_Slides_SubsWG_GEC5.pdf (136.7 KB) - added by 15 years ago.
- WiMAX_OMF_integration_GEC5_7.09.pdf (4.8 MB) - added by 15 years ago.
- UltraScienceNet-5GENI-Rao.pdf (5.1 MB) - added by 15 years ago.
- 072109_ChrisTracy_SWG_HorizVert_integration.pdf (3.5 MB) - added by 15 years ago.