Version 4 (modified by 10 years ago) (diff) | ,
---|
GEC19 Tutorial: Inter-Aggregate Experiments
Schedule
This tutorial will be offered twice:
Monday 1.30pm-3pm
and
Monday 3.30pm-5pm
Tutorial Instructors
Niky Riga GPO |
Aaron Helsinger GPO |
Luisa Nevers GPO |
Agenda / Details
During this tutorial, we will discuss various ways of connecting reserved resources at multiple aggregates for data connections. This may include ExoGENI topologies reserved through the ExoSM, GRE tunnels, and other capabilities. The tutorial will walk through the use of the stitcher
tool that comes with Omni to reserve private layer 2 connections between experimental hosts.
Pre-Requisites
Attendees should be comfortable reserving resources using Omni, and have Omni installed on a laptop that they bring to the tutorial.
Tutorial materials
Instructions:
Slides:
Attachments (1)
- GEC19-InterAggregate.pptx (4.4 MB) - added by 10 years ago.