Changes between Version 4 and Version 5 of GEC18Agenda/WiMAXDevelopers


Ignore:
Timestamp:
10/23/13 15:03:39 (10 years ago)
Author:
agosain@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC18Agenda/WiMAXDevelopers

    v4 v5  
    8585
    8686=== 3.1)  Cooperate with Clearwire ===
    87 11:35am  [[BR]]
     8711:05am  [[BR]]
    8888Ivan Seskar (WINLAB) and Manu Gosain (GPO)[[BR]]
    89890min
     
    23423412:20pm  [[BR]]
    235235Manu Gosain (GPO), Ivan Seskar (WINLAB)  [[BR]]
    236 0min  [[BR]]
     2365min  [[BR]]
    237237
    238238Current status: [[BR]]
     
    240240
    241241Next steps:  [[BR]]
    242  * Remaining sites should connect, when have upgraded their WiMAX RF AggMgr.
     242 * Final installation of Wimax-rf service will collect OML stats from the Base station and report this back to GMOC
    243243
    244244=== 4.4)  Write and Introduce Mobility/Handover/Multi-homing Services  ===
    245 9:25am  [[BR]]
     24512:25pm  [[BR]]
    246246Parmesh Ramanathan  (Wisconsin)  [[BR]]
    247 8min  [[BR]]
     2475min  [[BR]]
    248248
    249249 * Projects requiring handover include:  Clemson, Wayne State, Wisconsin and UCLA.    [[BR]]
     
    265265
    266266 * Suggested steps:    [[BR]]
    267   1) Yellow mobile nodeode with two interfaces, doing handover between two BS on the same subnet [[BR]]
     267  1) Yellow mobile node with two interfaces, doing handover between two BS on the same subnet [[BR]]
    268268  2) Transparent MobileIP working to implement a baseline Layer 3 handover scheme [[BR]]
    269269  3) Support new Layer 3 solutions like Mobility First? [[BR]]
     
    286286=== 4.5)  Acquire and Add Android Handsets ===
    2872879:35am  [[BR]]
    288 Derek Meyer (Univ Wisconsin)[[BR]]
     288Ivan Seskar (Rutgers University) [[BR]]
    2892895min  [[BR]]
    290290
    291291
    292  * Summary of discussions with Sprint about unlocked HTC Evo handset  [[BR]]
    293   * 3-way NDA was signed  [[BR]]
    294   * Sprint has subcontractor who handles such purchases: contact is ? [[BR]]
    295   * Many handsets in warehouse, such as HTC Evo 4G;  approx $300 per handset[[BR]]
    296   * Must be unlocked by subcontractor, so can register with GENI network;  need to provide config to subcontractor (done by Ivan)[[BR]]
    297   * Must be sure can download Android apps[[BR]]
    298 
    299 What are next steps?   [[BR]]
    300  * Working with other projects, establish how many handsets are needed at which sites   [[BR]]
    301  * Consider how to provide handsets to projects no longer supported by the GPO  [[BR]]
    302  * Complete negotiation with Sprint subcontractor (WSA Distributing), and order devices  (due 12/1/12) [[BR]]
    303  * Get and check samples?  [[BR]]
    304  * Verify operation, and loading of apps [[BR]]
    305  * Deliver handsets to other projects  (due 1/15/13)  [[BR]]
     292 * 15 handsets have been ordered and received via the Sprint MVNO arrangement
     293 * Samsung galaxy S2 that runs android 4.1.2 Jelly bean
     294 * Verify operation, and loading of apps by Rutgers [[BR]]
     295 * Order multiple number of handsets (order of 100) for all GENI Wimax sites
     296 * Deliver handsets to other projects    [[BR]]
    306297 * Support use by other projects  [[BR]]
    307  * Maintain relationship with WSA Distributing  [[BR]]
     298 * Maintain relationship with SciWiNet to use data plans that are in place with WSA for experiments  [[BR]]
    308299
    309300
     
    313304 * Next"  send rep an "xml profile", previously used
    314305
     306
    315307=== 4.6) Integration with GENI portal and making WiMAX Sites Accessible to Experimenters ===
    3163089:45am  [[BR]]
     
    322314
    323315 
    324 === 4.7)  Connect WiMAX Sites to Persistent I2 Backbone Network, with IP Routing, to Support Multi-site Experiments ===
     316=== 4.7)  Connect WiMAX Sites to Persistent I2 Backbone Network using AL2S and Integration of GENI racks and Wimax Base station controllers ===
    3253179:45am  [[BR]]
    326318Manu Gosain (GPO) and Ivan Seskar (WINLAB)  [[BR]]
    327 0min  [[BR]]
     3195min  [[BR]]
    328320
    329321
     
    347339
    348340What are next steps?  (Manu Gosain)  [[BR]]
    349  * Establish planned configuration  (due 11/15/12) [[BR]]
    350  * Establish plan with schedule to connect all sites  (due 11/15/12) [[BR]]
    351  * Track connection of sites, and assist them as needed  [[BR]]
     341 * Use I2 AL2S service to create a single multi-point VLAN that encompasses all Wimax sites
     342 * Connect the Wimax multi-site VLAN at each campus upstream to respective GENI rack
     343 * GENI rack dataplane connectivity will be the cross-connect piece between AL2S and the wimax base station controller
    352344
    353345Current status: