Changes between Version 21 and Version 22 of GEC16Agenda/WiMAX-Developers


Ignore:
Timestamp:
03/18/13 22:36:30 (11 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC16Agenda/WiMAX-Developers

    v21 v22  
    3131== 1)  Introductions ==
    32323:30pm  [[BR]]
    33 
     335min [[BR]]
    3434
    3535== 2)  Spiral 5 Goals ==
     363:35pm  [[BR]]
    3637Harry Mussman (GPO) [[BR]]
     380min  [[BR]]
    3739
    3840a)  Where necessary, complete deployments planned for Spiral 4:  [[BR]]
     
    8688=== 3.1)  Co-exist with Clearwire ===
    87893:35pm  [[BR]]
    88 Manu Gosain  (GPO) and Ivan Seskar (WINLAB)[[BR]]
     90Ray Raychaudhuri (WINLAB), Ivan Seskar (WINLAB) and Harry Mussman (GPO)[[BR]]
     9110min
    8992
    9093 * Current approach, as an alternative to an agreement that leases Clearwire spectrum to GENI sites:  [[BR]]
     
    114117=== 3.2)  Access to Sprint Broadband Services via MVNO Arrangements ===
    1151183:45pm  [[BR]]
    116 Jim Martin (Clemson Univ)
     119Jim Martin (Clemson Univ) and Harry Mussman (GPO) [[BR]]
     12010min  [[BR]]
    117121
    118122 *  Discussions with Sprint and their partner, Arterra
     
    1271313:55pm  [[BR]]
    128132Suman Banerjee  [[BR]]
     1335min [[BR]]
    129134
    130135GEC14 discussion:  [[BR]]
     
    1771824:00pm  [[BR]]
    178183Manu Gosain  (GPO) and Ivan Seskar (WINLAB)  [[BR]]
     1846min  [[BR]]
     185
    179186
    180187 *  Airspan base stations successfully installed:
     
    1921994:05pm  [[BR]]
    193200Ivan Seskar  (WINLAB) [[BR]]
     20110min  [[BR]]
    194202
    195203 * These are "yellow nodes", introduced in ORBIT testbed [[BR]]
     
    2242324:15pm  [[br]]
    225233Ivan Seskar  (Rutgers WINLAB) and Davide Pesavento (UCLA)  [[BR]]
     23410min  [[BR]]
    226235
    227236 * Multiple Base-Station Mgmt Srvc:  [[BR]]
     
    263272
    264273=== 4.4)  Support Central Monitoring by Rutgers WINLAB ===
    265 4:25pm
     2744:25pm  [[BR]]
    266275Manu Gosain (GPO), Ivan Seskar (WINLAB)  [[BR]]
    267 
     2760min  [[BR]]
    268277
    269278
     
    2712804:25pm  [[BR]]
    272281Parmesh Ramanathan  (Wisconsin)  [[BR]]
     2828min  [[BR]]
    273283
    274284 * Projects requiring handover include:  Clemson, Wayne State, Wisconsin and UCLA.    [[BR]]
     
    307317=== 4.6)  Consider WiScape Measurement Framework ===
    3083184:33pm  [[BR]]
    309 Suman Banerjee (Univ Wisc)
     319Suman Banerjee (Univ Wisc)  [[BR]]
     3202min [[BR]]
    310321
    311322 * Overview of current functions  [[BR]]
     
    3243354:35pm  [[BR]]
    325336Manu Gosain (GPO), Ivan Seskar (WINLAB)  [[BR]]
    326 
     3370min  [[BR]]
    327338
    328339=== 4.8)  Acquire and Add Android Handsets ===
    3293404:35pm  [[BR]]
    330341Derek Meyer (Univ Wisconsin)[[BR]]
     3425min  [[BR]]
     343
    331344
    332345 * Summary of discussions with Sprint about unlocked HTC Evo handset  [[BR]]
     
    351364=== 4.9)  Add Vehicular Mobile Stations Based on Yellow Node ===
    3523654:40pm  [[BR]]
    353 
     366Giovanni Pau (UCLA) and Ivan Seskar (WINLAB)  [[BR]]
     3670min  [[BR]]
    354368
    355369
     
    3573714:40pm  [[BR]]
    358372Fraida Fund  (NYU Poly)  [[BR]]
    359 
     3735min
    360374
    361375
     
    3643784:45pm  [[BR]]
    365379Fraida Fund (NYU Poly), Manu Gosain (GPO), Derek Meyer (Wisconsin), [[BR]]
     3800min  [[BR]]
    366381
    367382 * Equip a WiMAX site with full OMF/OML capabilities, installing on VMs  [[BR]]
     
    4284434:45pm  [[BR]]
    429444Manu Gosain (GPO), Fraida Fund (NYU Poly), Ivan Seskar (WINLAB)  [[BR]]
     4450min  [[BR]]
     446
    430447
    431448* Connect a WiMAX site to the GENI I2 backbone network  [[BR]]
     
    4604774:45pm  [[BR]]
    461478Manu Gosain (GPO) and members of site teams [[BR]]
     47915min  [[BR]]
    462480
    463481Go to [http://groups.geni.net/geni/wiki/WiMAXSiteDeployments  Status of GENI WiMAX site deployments]  [[BR]]
     
    4684865:00pm  [[BR]]
    469487Thanasis Korakis  (NYU Poly)  [[BR]]
     4880min  [[BR]]
    470489
    471490 Funded project (1/13 - 12/13) to define lab experiments for students to teach wireless basics  [[BR]]
     
    4804995:00pm [[BR]]
    481500Kiran Nagaraja (WINLAB)  [[BR]]
     5010min  [[BR]]
    482502
    483503GEC14 presentation:  [[BR]]
     
    4975175:00pm
    498518Organized by Fraida Fund  (NYU Poly)  [[BR]]
     5190min  [[BR]]
    499520
    500521[http://groups.geni.net/geni/wiki/GEC16Agenda/WiMAX-Tutorial  WiMAX Tutorials at GEC16]  [[BR]]