Changes between Version 48 and Version 49 of GEC15Agenda/WiMAXUpdate


Ignore:
Timestamp:
11/02/12 12:01:16 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC15Agenda/WiMAXUpdate

    v48 v49  
    27273:00pm  [[BR]]
    2828
    29 == 2)  Strategy and Goals ==
     29== 2)  Goals and Extensions ==
    30303:05pm   [[BR]]
    3131
     
    539539
    540540
    541  * Spectrum loan from Clearwire: done [[BR]] 
     541 * Spectrum loan from Clearwire: done [[BR]]
    542542  * 10MHz band: 2591MHz – 2601MHz (belongs to 2510 Mid band of 2560MHz~2630MHz) [[BR]] 
    543543  * Current loan valid until March 1, 2013; to be renewed annually afterwards [[BR]] 
     
    545545GEC15 status:  [[BR]]
    546546
    547  * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/WayneWiMAX-deployment-planAndStatus-GEC15-final.pdf  slides]  [[BR]] 
    548 
    549  * Airspan base stations: [[BR]] 
    550   * 2 installed on 17th floor, and on the air;  CINR measured [[BR]] 
    551  
     547 * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/WayneWiMAX-deployment-planAndStatus-GEC15-final.pdf  slides]  [[BR]]
     548
     549 * Airspan base stations: [[BR]]
     550  * 2 installed on 17th floor, and on the air;  CINR measured [[BR]]
     551
    552552
    553553a)  Status of deployments planned for Spiral 4:  [[BR]]