Changes between Version 43 and Version 44 of GEC15Agenda/WiMAXUpdate
- Timestamp:
- 10/30/12 13:42:55 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC15Agenda/WiMAXUpdate
v43 v44 588 588 589 589 GEC14 status: [[BR]] 590 * Status[http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf slides] [[BR]]590 * [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf slides] [[BR]] 591 591 592 592 * Operational OMF/OML installation[[BR]] 593 * Created OML-ized applications that may be useful to other sites (VLC, BitTorrent client, HTTP server and client)[[BR]] 594 * More under development, e.g. OMF driver for Teltonika WiMAX devices[[BR]] 595 593 * Connected to I2 backbone network[[BR]] 596 594 * Testbed open to experimenters since GEC12[[BR]] 597 * Register at http://witestlab.poly.edu[[BR]]598 * Experimenter outreach with tutorials at GEC13, Tridentcom, GEC14[[BR]]599 600 * Connected to I2 backbone network[[BR]]601 * New wimaxrf[[BR]]602 * Multi-site capability demonstrated at demo night, tutorial[[BR]]603 604 * Extra capabilities and tools[[BR]]605 * Environmental sensors (temperature, humidity, light)[[BR]]606 595 607 596 GEC15 status: [[BR]] 608 597 609 [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]] 598 * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]] 599 600 * Airspan base station isntallation still pending. 601 * Working closely with UMass Amherst on use of GIMI tools with WiMAX 602 * Supporting experimenters, including students and tutorials 610 603 611 604 a) Status of deployments planned for Spiral 4: [[BR]] 612 Get experimental frequency from the FCC, that does not interfere with Clearwire services [[BR]]613 Install Airspan base station(s), with local NetSpan management system [[BR]]614 Optional when multiple cells: backhaul control and data traffic to central equipment site [[BR]]615 Add OMF/OML structures, including LoginService [[BR]]616 Connect via switch to I2 backbone, via OF switches if there [[BR]]617 WiFi access point for dual-homing operating on custom PC node [[BR]]618 Vehicular mobile station operating on custom PC node [[BR]]619 Fixed “mobile station” for remote experimenters operating on custom PC node [[BR]]605 Get experimental frequency from the FCC, that does not interfere with Clearwire services (yes) [[BR]] 606 Install Airspan base station(s), with local NetSpan management system (pending) [[BR]] 607 Optional when multiple cells: backhaul control and data traffic to central equipment site (?) [[BR]] 608 Add OMF/OML structures, including LoginService (yes) [[BR]] 609 Connect via switch to I2 backbone, via OF switches if there (yes) [[BR]] 610 WiFi access point for dual-homing operating on custom PC node (yes) [[BR]] 611 Vehicular mobile station operating on custom PC node (?) [[BR]] 612 Fixed “mobile station” for remote experimenters operating on custom PC node (yes) [[BR]] 620 613 621 614 b) Plan for local research experiments in Spiral 5: [[BR]] 622 Focus on goals, configurations, steps [[BR]] 623 Identify necessary extended site capabilities needed in Spiral 5 [[BR]] 615 Many experiments formulated for students, and tutorials, including: [[BR]] 616 StreamLoad [[BR]] 617 NetCheck [[BR]] 618 AFFIX [[BR]] 619 Working on set of lab experiments to teach wireless principals [[BR]] 624 620 625 621 c) Plan to complete deployments of extended site capabilities needed in Spiral 5: [[BR]] 626 Additional base station (Rutgers WINLAB) [[BR]]627 Custom PC nodes ("yellow nodes") (Rutgers WINLAB) [[BR]]628 Login Service plus OMF/OML services operating on custom PC node (Rutgers WINLAB) [[BR]]629 Connection to I2 (coordinated by BBN) [[BR]]630 622 GIMI I&M services (UMass Amherst/NYU Poly) [[BR]] 631 623 Multiple base-station management service operating on custom PC node (Rutgers WINLAB) [[BR]] 632 624 Data-path gateway service operating on custom PC node (Rutgers WINLAB) [[BR]] 633 625 Mobility/handover/multi-homing service (coordinated by Wisconsin/Clemson) [[BR]] 634 WiFi access point for dual-homing operating on custom PC node (Rutgers WINLAB) [[BR]]635 626 Vehicular mobile station operating on custom PC node (Rutgers WINLAB) [[BR]] 636 Fixed “mobile station” for remote experimenters operating on custom PC node (Rutgers WINLAB) [[BR]]637 627 Unlocked Android WiMAX/WiFi handsets. (Wisconsin) [[BR]] 638 628 … … 655 645 656 646 GEC14 status: 657 * Status [[BR]] 658 * Add OMF/OML: have installed [[BR]] 659 * Connect to I2 backbone network: plan to do soon [[BR]] 647 * Add OMF/OML: have installed [[BR]] 648 * Connect to I2 backbone network: plan to do soon [[BR]] 660 649 661 650 * Planned experiments: use to integrate GIMI tools [[BR]] … … 668 657 669 658 GEC14 status: [[BR]] 659 * [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/geni-meeting-temple-july2012.pptx slides] [[BR]] 660 670 661 * Extension plan [[BR]] 671 662 * x1 (or x2?) Airspan base stations (2510 Mid: 2560MHz to 2630MHz) [[BR]] … … 674 665 * Mobility and handover [[BR]] 675 666 676 * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/geni-meeting-temple-july2012.pptx slides] [[BR]]677 678 667 * License application approved by Clear [[BR]] 679 668 * License is valid until Jan 31, 2013 [[BR]] … … 694 683 695 684 GEC15 status: BR]] 696 No report [[BR]]685 * No report [[BR]] 697 686 698 687 === 3.xx) Drexel University Site Deployment Plan === 699 688 Kevin Wanuga, Jeff Wildman, Kapil Dandekar (Drexel) [[BR]] 689 690 GEC13 plans: [[BR]] 691 * [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC13%20%20drexel%20%20GENI.ppt slides] [[BR]] 700 692 701 693 GEC14 status: [[BR]] … … 705 697 * Location and backhaul [[BR]] 706 698 * Mobility and handover [[BR]] 707 708 * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC13%20%20drexel%20%20GENI.ppt slides} from GEC13 [[BR]]709 699 710 700 * Kevin Wanuga reports: [[BR]] … … 718 708 719 709 GEC15 status: BR]] 720 No report [[BR]]710 * No report [[BR]] 721 711 722 712 … … 725 715 Dirk Grunwald (Colorado) [[BR]] 726 716 727 GEC13 status: [[BR]]728 * Status on 5/23: [[BR]]729 * On-the-air again, after replacing server;730 731 * Planned experiments [[BR]]732 * Being used for thesis research measruements [[BR]]733 734 717 735 718 GEC15 status: BR]] 736 No report [[BR]]719 * No report [[BR]] 737 720 738 721 === 3.xx) Columbia University Site Update === … … 741 724 742 725 GEC15 status: BR]] 743 No report [[BR]]726 * No report [[BR]] 744 727 745 728 == 4) GENI WiMAX Deployment Tasks and Issues ==