530 | | * WiMAX network equipment [[BR]] |
531 | | * Being in touch with facilities and campus IT on deployment logistics [[BR]] |
532 | | * Received three WiMAX base stations and accessories on 06/25/2012 [[BR]] |
533 | | * Now working with facilities and campus IT on concrete action items [[BR]] |
534 | | * Equipment purchase: mounting masts, networking, electricity; servers, laptops (+ USB dongles through UWM) [[BR]] |
535 | | * Contracting roof-mount and installation [[BR]] |
536 | | |
537 | | * By end of Year 1 [[BR]] |
538 | | * Complete installation and measurement study of the WiMAX network [[BR]] |
539 | | * Time to get OMF running? [[BR]] |
540 | | * Connect the WiMAX network to GENI backbone via VLAN [[BR]] |
541 | | * One source of uncertainty: re-roofing work on the deployment site until mid/late August [[BR]] |
542 | | * Exploring mechanisms for deploying WiMAX network in parallel [[BR]] |
543 | | * (No need to worry about re-roofing in the coming 20-30 years ) [[BR]] |
544 | | |
545 | | * Year 2 [[BR]] |
546 | | * Incorporating OpenXC vehicular sensing and infotainment platform [[BR]] |
547 | | * Enabling handoff between different base stations/sectors [[BR]] |
| 531 | GEC15 status: [[BR]] |
| 532 | |
| 533 | * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/WayneWiMAX-deployment-planAndStatus-GEC15-final.pdf slides] [[BR]] |
| 534 | |
| 535 | * Airspan base stations: [[BR]] |
| 536 | * 2 installed on 17th floor, and on the air; CINR measured [[BR]] |
| 537 | |
| 538 | |
| 539 | a) Status of deployments planned for Spiral 4: [[BR]] |
| 540 | Get experimental frequency from the FCC, that does not interfere with Clearwire services (yes) [[BR]] |
| 541 | Install Airspan base station(s), with local NetSpan management system (yes, 2 of 3) [[BR]] |
| 542 | Optional when multiple cells: backhaul control and data traffic to central equipment site (yes, to equipment room) [[BR]] |
| 543 | Add OMF/OML structures, including LoginService (no) [[BR]] |
| 544 | Connect via switch to I2 backbone, via OF switches if there (pending) [[BR]] |
| 545 | Vehicular mobile station operating on custom PC node (no) [[BR]] |
| 546 | Fixed “mobile station” for remote experimenters operating on custom PC node (no) [[BR]] |
| 547 | |
| 548 | b) Plan for local research experiments in Spiral 5: [[BR]] |
| 549 | Enable handoff between different base stations/sectors [[BR]] |
| 550 | Develop measurement services |
| 551 | Measurement campaign: spatiotemporal behavior in static & mobile scenarios: smart grid and smart transportation |
| 552 | ns-3 integration |
| 553 | GENI-fy OpenXC vehicular sensing and infotainment platform |
| 554 | Refine OpenXC, virtualization, etc |
| 555 | Integrate with OMF, measurement tools |
| 556 | Integrate with v2V & V2I platforms (i.e., SDR) as well as vehicle sensing and control apps |
| 557 | |
| 558 | c) Plan to complete deployments of extended site capabilities needed in Spiral 5: [[BR]] |
| 559 | Additional base station (pending) (Rutgers WINLAB) [[BR]] |
| 560 | Custom PC nodes ("yellow nodes") (Rutgers WINLAB) [[BR]] |
| 561 | Login Service plus OMF/OML services operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 562 | Connection to I2 (coordinated by BBN) [[BR]] |
| 563 | GIMI I&M services (UMass Amherst/NYU Poly) [[BR]] |
| 564 | Multiple base-station management service operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 565 | Data-path gateway service operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 566 | Mobility/handover/multi-homing service (coordinated by Wisconsin/Clemson) [[BR]] |
| 567 | Vehicular mobile station operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 568 | Fixed “mobile station” for remote experimenters operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 569 | Unlocked Android WiMAX/WiFi handsets. (Wisconsin) [[BR]] |
| 570 | |
| 571 | d) Support for unified GENI operations: [[BR]] |
| 572 | Forward site monitoring information to the central monitoring server (Rutgers WINLAB) [[BR]] |
| 573 | Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]] |
| 574 | When necessary, do an “emergency stop” of your transmissions. [[BR]] |
| 575 | |
| 576 | e) Support for experiments: [[BR]] |
| 577 | Local research experiments [[BR]] |
| 578 | Experiments by remote experimenters, including those at tutorials [[BR]] |
| 579 | Classroom instruction experiments by students (NYU Poly) [[BR]] |
| 580 | Multi-site experiments, e.g., MobilityFirst (Rutgers WINLAB) [[BR]] |
| 581 | |
| 582 | |
| 583 | |
| 584 | |
| 585 | === 3.8) NYU Poly Site Update === |
| 586 | 3:50pm [[BR]] |
| 587 | Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]] |
| 588 | |
| 589 | GEC14 status: [[BR]] |
| 590 | * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf slides] [[BR]] |
| 591 | |
| 592 | * Operational OMF/OML installation[[BR]] |
| 593 | * Created OML-ized applications that may be useful to other sites (VLC, BitTorrent client, HTTP server and client)[[BR]] |
| 594 | * More under development, e.g. OMF driver for Teltonika WiMAX devices[[BR]] |
| 595 | |
| 596 | * Testbed open to experimenters since GEC12[[BR]] |
| 597 | * Register at http://witestlab.poly.edu[[BR]] |
| 598 | * Experimenter outreach with tutorials at GEC13, Tridentcom, GEC14[[BR]] |
| 599 | |
| 600 | * Connected to I2 backbone network[[BR]] |
| 601 | * New wimaxrf[[BR]] |
| 602 | * Multi-site capability demonstrated at demo night, tutorial[[BR]] |
| 603 | |
| 604 | * Extra capabilities and tools[[BR]] |
| 605 | * Environmental sensors (temperature, humidity, light)[[BR]] |
| 606 | |
| 607 | GEC15 status: [[BR]] |
| 608 | |
| 609 | [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]] |
590 | | |
591 | | === 3.8) NYU Poly Site Update === |
592 | | 3:50pm [[BR]] |
593 | | Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]] |
594 | | |
595 | | GEC14 status: [[BR]] |
596 | | * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf slides] [[BR]] |
597 | | |
598 | | * Operational OMF/OML installation[[BR]] |
599 | | * Created OML-ized applications that may be useful to other sites (VLC, BitTorrent client, HTTP server and client)[[BR]] |
600 | | * More under development, e.g. OMF driver for Teltonika WiMAX devices[[BR]] |
601 | | |
602 | | * Testbed open to experimenters since GEC12[[BR]] |
603 | | * Register at http://witestlab.poly.edu[[BR]] |
604 | | * Experimenter outreach with tutorials at GEC13, Tridentcom, GEC14[[BR]] |
605 | | |
606 | | * Connected to I2 backbone network[[BR]] |
607 | | * New wimaxrf[[BR]] |
608 | | * Multi-site capability demonstrated at demo night, tutorial[[BR]] |
609 | | |
610 | | * Extra capabilities and tools[[BR]] |
611 | | * Environmental sensors (temperature, humidity, light)[[BR]] |
612 | | |
613 | | GEC15 status: [[BR]] |
614 | | |
615 | | [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]] |
616 | | |
617 | | a) Status of deployments planned for Spiral 4: [[BR]] |
618 | | Get experimental frequency from the FCC, that does not interfere with Clearwire services [[BR]] |
619 | | Install Airspan base station(s), with local NetSpan management system [[BR]] |
620 | | Optional when multiple cells: backhaul control and data traffic to central equipment site [[BR]] |
621 | | Add OMF/OML structures, including LoginService [[BR]] |
622 | | Connect via switch to I2 backbone, via OF switches if there [[BR]] |
623 | | WiFi access point for dual-homing operating on custom PC node [[BR]] |
624 | | Vehicular mobile station operating on custom PC node [[BR]] |
625 | | Fixed “mobile station” for remote experimenters operating on custom PC node [[BR]] |
626 | | |
627 | | b) Plan for local research experiments in Spiral 5: [[BR]] |
628 | | Focus on goals, configurations, steps [[BR]] |
629 | | Identify necessary extended site capabilities needed in Spiral 5 [[BR]] |
630 | | |
631 | | c) Plan to complete deployments of extended site capabilities needed in Spiral 5: [[BR]] |
632 | | Additional base station (Rutgers WINLAB) [[BR]] |
633 | | Custom PC nodes ("yellow nodes") (Rutgers WINLAB) [[BR]] |
634 | | Login Service plus OMF/OML services operating on custom PC node (Rutgers WINLAB) [[BR]] |
635 | | Connection to I2 (coordinated by BBN) [[BR]] |
636 | | GIMI I&M services (UMass Amherst/NYU Poly) [[BR]] |
637 | | Multiple base-station management service operating on custom PC node (Rutgers WINLAB) [[BR]] |
638 | | Data-path gateway service operating on custom PC node (Rutgers WINLAB) [[BR]] |
639 | | Mobility/handover/multi-homing service (coordinated by Wisconsin/Clemson) [[BR]] |
640 | | WiFi access point for dual-homing operating on custom PC node (Rutgers WINLAB) [[BR]] |
641 | | Vehicular mobile station operating on custom PC node (Rutgers WINLAB) [[BR]] |
642 | | Fixed “mobile station” for remote experimenters operating on custom PC node (Rutgers WINLAB) [[BR]] |
643 | | Unlocked Android WiMAX/WiFi handsets. (Wisconsin) [[BR]] |
644 | | |
645 | | d) Support for unified GENI operations: [[BR]] |
646 | | Forward site monitoring information to the central monitoring server (Rutgers WINLAB) [[BR]] |
647 | | Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]] |
648 | | When necessary, do an “emergency stop” of your transmissions. [[BR]] |
649 | | |
650 | | e) Support for experiments: [[BR]] |
651 | | Local research experiments [[BR]] |
652 | | Experiments by remote experimenters, including those at tutorials [[BR]] |
653 | | Classroom instruction experiments by students (NYU Poly) [[BR]] |
654 | | Multi-site experiments, e.g., MobilityFirst (Rutgers WINLAB) [[BR]] |
655 | | |
656 | | |
657 | | |