409 | | * Purchased and received the Mean Well 450W power supply [[BR]] |
410 | | * Received missing mounting brackets for ODU [[BR]] |
411 | | * Tower analysis should have been completed by Friday [[BR]] |
412 | | * Unanswered questions: length of burial cat5e; distance to junction box [[BR]] |
413 | | * Recommendation: include surge protector in long cat5e cable! [[BR]] |
| 414 | * Planned installation blocked by site issues [[BR]] |
| 415 | * Instead, will move quickly to install on CS building (where Cisco base station was installed) [[BR]] |
| 416 | |
| 417 | a) Status of deployments planned for Spiral 4: [[BR]] |
| 418 | Get experimental frequency from the FCC, that does not interfere with Clearwire services (yes) [[BR]] |
| 419 | Install Airspan base station(s), with local NetSpan management system (no; restarting) [[BR]] |
| 420 | Optional when multiple cells: backhaul control and data traffic to central equipment site (?) [[BR]] |
| 421 | Add OMF/OML structures, including LoginService (partial) [[BR]] |
| 422 | Connect via switch to I2 backbone, via OF switches if there (?) [[BR]] |
| 423 | WiFi access point for dual-homing operating on custom PC node (no) [[BR]] |
| 424 | Vehicular mobile station operating on custom PC node (no) [[BR]] |
| 425 | Fixed “mobile station” for remote experimenters operating on custom PC node (no) [[BR]] |
| 426 | |
| 427 | b) Plan for local research experiments in Spiral 5: [[BR]] |
| 428 | Focus on mobility experiments from bus [[BR]] |
| 429 | Planning multi-site video experiment with NYU Poly [[BR]] |
| 430 | Begin classroom use in Spring 2013 [[BR]] |
| 431 | |
| 432 | c) Plan to complete deployments of extended site capabilities needed in Spiral 5: [[BR]] |
| 433 | Custom PC nodes ("yellow nodes") (Rutgers WINLAB) [[BR]] |
| 434 | Login Service plus OMF/OML services operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 435 | Connection to I2 (coordinated by BBN) [[BR]] |
| 436 | GIMI I&M services (UMass Amherst/NYU Poly) [[BR]] |
| 437 | Multiple base-station management service operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 438 | Data-path gateway service operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 439 | Mobility/handover/multi-homing service (coordinated by Wisconsin/Clemson) [[BR]] |
| 440 | WiFi access point for dual-homing operating on custom PC node (Rutgers WINLAB) (or use local service?) [[BR]] |
| 441 | Vehicular mobile station operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 442 | Fixed “mobile station” for remote experimenters operating on custom PC node (Rutgers WINLAB) [[BR]] |
| 443 | Unlocked Android WiMAX/WiFi handsets. (Wisconsin) [[BR]] |
| 444 | |
| 445 | d) Support for unified GENI operations: [[BR]] |
| 446 | Forward site monitoring information to the central monitoring server (Rutgers WINLAB) [[BR]] |
| 447 | Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]] |
| 448 | When necessary, do an “emergency stop” of your transmissions. [[BR]] |
| 449 | |
| 450 | e) Support for experiments: [[BR]] |
| 451 | Local research experiments [[BR]] |
| 452 | Experiments by remote experimenters, including those at tutorials [[BR]] |
| 453 | Classroom instruction experiments by students (NYU Poly) [[BR]] |
| 454 | Multi-site experiments, e.g., MobilityFirst (Rutgers WINLAB) [[BR]] |
| 455 | |
| 456 | |
| 457 | === 3.6) University of Michigan Site Deployment Plan === |
| 458 | 3:40pm [[BR]] |
| 459 | Morley Mao (Michigan) [[BR]] |
| 460 | |
| 461 | GEC14 status: [[BR]] |
| 462 | * Extension plan [[BR]] |
| 463 | * Add one Airspan on top of building [[BR]] |
| 464 | * Will signals penetrate into buildings? [[BR]] |
| 465 | * One frequency from Clearwire [[BR]] |
| 466 | * x1 (2510 Lo: 2496 to 2570 MHz) [[BR]] |
| 467 | * Location and backhaul [[BR]] |
| 468 | * Mobility and handover [[BR]] |
| 469 | |
| 470 | * Status [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf slides] from GEC13 [[BR]] |
| 471 | * Recent report: now mounting and painting antenna [[BR]] |
461 | | * Add one Airspan on top of building [[BR]] |
462 | | * Will signals penetrate into buildings? [[BR]] |
463 | | * One frequency from Clearwire [[BR]] |
464 | | * x1 (2510 Lo: 2496 to 2570 MHz) [[BR]] |
465 | | * Location and backhaul [[BR]] |
466 | | * Mobility and handover [[BR]] |
467 | | |
468 | | * Status [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf slides] from GEC13 [[BR]] |
469 | | * Recent report: now mounting and painting antenna [[BR]] |
| 521 | * Plan: one site with three sectors, and 3 Airspan base stations. [[BR]] |
| 522 | * One frequency (10MHz) from Clearwire [[BR]] |
| 523 | * x3 (2510 Mid: 2560MHz to 2630MHz) [[BR]] |
| 524 | |
| 525 | * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/WayneWiMAX-deployment-planAndStatus-GEC14.pdf slides] [[BR]] |
| 526 | |
| 527 | * Spectrum loan from Clearwire: done [[BR]] |
| 528 | * 10MHz band: 2591MHz – 2601MHz (belongs to 2510 Mid band of 2560MHz~2630MHz) [[BR]] |
| 529 | * Current loan valid until March 1, 2013; to be renewed annually afterwards [[BR]] |
| 530 | |
| 531 | * WiMAX network equipment [[BR]] |
| 532 | * Being in touch with facilities and campus IT on deployment logistics [[BR]] |
| 533 | * Received three WiMAX base stations and accessories on 06/25/2012 [[BR]] |
| 534 | * Now working with facilities and campus IT on concrete action items [[BR]] |
| 535 | * Equipment purchase: mounting masts, networking, electricity; servers, laptops (+ USB dongles through UWM) [[BR]] |
| 536 | * Contracting roof-mount and installation [[BR]] |
| 537 | |
| 538 | * By end of Year 1 [[BR]] |
| 539 | * Complete installation and measurement study of the WiMAX network [[BR]] |
| 540 | * Time to get OMF running? [[BR]] |
| 541 | * Connect the WiMAX network to GENI backbone via VLAN [[BR]] |
| 542 | * One source of uncertainty: re-roofing work on the deployment site until mid/late August [[BR]] |
| 543 | * Exploring mechanisms for deploying WiMAX network in parallel [[BR]] |
| 544 | * (No need to worry about re-roofing in the coming 20-30 years ) [[BR]] |
| 545 | |
| 546 | * Year 2 [[BR]] |
| 547 | * Incorporating OpenXC vehicular sensing and infotainment platform [[BR]] |
| 548 | * Enabling handoff between different base stations/sectors [[BR]] |
513 | | === 3.7) Wayne State University Site Deployment Plan === |
514 | | 3:45m [[BR]] |
515 | | Hongwei Zhang, Yu Chu (Wayne State) [[BR]] |
516 | | |
517 | | GEC14 status: |
518 | | * Extension plan [[BR]] |
519 | | * Plan: one site with three sectors, and 3 Airspan base stations. [[BR]] |
520 | | * One frequency (10MHz) from Clearwire [[BR]] |
521 | | * x3 (2510 Mid: 2560MHz to 2630MHz) [[BR]] |
522 | | |
523 | | * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/WayneWiMAX-deployment-planAndStatus-GEC14.pdf slides] [[BR]] |
524 | | |
525 | | * Spectrum loan from Clearwire: done [[BR]] |
526 | | * 10MHz band: 2591MHz – 2601MHz (belongs to 2510 Mid band of 2560MHz~2630MHz) [[BR]] |
527 | | * Current loan valid until March 1, 2013; to be renewed annually afterwards [[BR]] |
528 | | |
529 | | * WiMAX network equipment [[BR]] |
530 | | * Being in touch with facilities and campus IT on deployment logistics [[BR]] |
531 | | * Received three WiMAX base stations and accessories on 06/25/2012 [[BR]] |
532 | | * Now working with facilities and campus IT on concrete action items [[BR]] |
533 | | * Equipment purchase: mounting masts, networking, electricity; servers, laptops (+ USB dongles through UWM) [[BR]] |
534 | | * Contracting roof-mount and installation [[BR]] |
535 | | |
536 | | * By end of Year 1 [[BR]] |
537 | | * Complete installation and measurement study of the WiMAX network [[BR]] |
538 | | * Time to get OMF running? [[BR]] |
539 | | * Connect the WiMAX network to GENI backbone via VLAN [[BR]] |
540 | | * One source of uncertainty: re-roofing work on the deployment site until mid/late August [[BR]] |
541 | | * Exploring mechanisms for deploying WiMAX network in parallel [[BR]] |
542 | | * (No need to worry about re-roofing in the coming 20-30 years ) [[BR]] |
543 | | |
544 | | * Year 2 [[BR]] |
545 | | * Incorporating OpenXC vehicular sensing and infotainment platform [[BR]] |
546 | | * Enabling handoff between different base stations/sectors [[BR]] |
| 592 | === 3.8) NYU Poly Site Update === |
| 593 | 3:50pm [[BR]] |
| 594 | Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]] |
| 595 | |
| 596 | GEC14 status: [[BR]] |
| 597 | * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf slides] [[BR]] |
| 598 | |
| 599 | * Operational OMF/OML installation[[BR]] |
| 600 | * Created OML-ized applications that may be useful to other sites (VLC, BitTorrent client, HTTP server and client)[[BR]] |
| 601 | * More under development, e.g. OMF driver for Teltonika WiMAX devices[[BR]] |
| 602 | |
| 603 | * Testbed open to experimenters since GEC12[[BR]] |
| 604 | * Register at http://witestlab.poly.edu[[BR]] |
| 605 | * Experimenter outreach with tutorials at GEC13, Tridentcom, GEC14[[BR]] |
| 606 | |
| 607 | * Connected to I2 backbone network[[BR]] |
| 608 | * New wimaxrf[[BR]] |
| 609 | * Multi-site capability demonstrated at demo night, tutorial[[BR]] |
| 610 | |
| 611 | * Extra capabilities and tools[[BR]] |
| 612 | * Environmental sensors (temperature, humidity, light)[[BR]] |
| 613 | |
| 614 | GEC15 status: [[BR]] |
| 615 | |
| 616 | [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]] |
589 | | |
590 | | === 3.8) NYU Poly Site Update === |
591 | | 3:50pm [[BR]] |
592 | | Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]] |
593 | | |
594 | | GEC14 status: [[BR]] |
595 | | * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf slides] [[BR]] |
596 | | |
597 | | * Operational OMF/OML installation[[BR]] |
598 | | * Created OML-ized applications that may be useful to other sites (VLC, BitTorrent client, HTTP server and client)[[BR]] |
599 | | * More under development, e.g. OMF driver for Teltonika WiMAX devices[[BR]] |
600 | | |
601 | | * Testbed open to experimenters since GEC12[[BR]] |
602 | | * Register at http://witestlab.poly.edu[[BR]] |
603 | | * Experimenter outreach with tutorials at GEC13, Tridentcom, GEC14[[BR]] |
604 | | |
605 | | * Connected to I2 backbone network[[BR]] |
606 | | * New wimaxrf[[BR]] |
607 | | * Multi-site capability demonstrated at demo night, tutorial[[BR]] |
608 | | |
609 | | * Extra capabilities and tools[[BR]] |
610 | | * Environmental sensors (temperature, humidity, light)[[BR]] |
611 | | |
612 | | GEC15 status: [[BR]] |
613 | | |
614 | | [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]] |
615 | | |
616 | | a) Status of deployments planned for Spiral 4: [[BR]] |
617 | | Get experimental frequency from the FCC, that does not interfere with Clearwire services [[BR]] |
618 | | Install Airspan base station(s), with local NetSpan management system [[BR]] |
619 | | Optional when multiple cells: backhaul control and data traffic to central equipment site [[BR]] |
620 | | Add OMF/OML structures, including LoginService [[BR]] |
621 | | Connect via switch to I2 backbone, via OF switches if there [[BR]] |
622 | | WiFi access point for dual-homing operating on custom PC node [[BR]] |
623 | | Vehicular mobile station operating on custom PC node [[BR]] |
624 | | Fixed “mobile station” for remote experimenters operating on custom PC node [[BR]] |
625 | | |
626 | | b) Plan for local research experiments in Spiral 5: [[BR]] |
627 | | Focus on goals, configurations, steps [[BR]] |
628 | | Identify necessary extended site capabilities needed in Spiral 5 [[BR]] |
629 | | |
630 | | c) Plan to complete deployments of extended site capabilities needed in Spiral 5: [[BR]] |
631 | | Additional base station (Rutgers WINLAB) [[BR]] |
632 | | Custom PC nodes ("yellow nodes") (Rutgers WINLAB) [[BR]] |
633 | | Login Service plus OMF/OML services operating on custom PC node (Rutgers WINLAB) [[BR]] |
634 | | Connection to I2 (coordinated by BBN) [[BR]] |
635 | | GIMI I&M services (UMass Amherst/NYU Poly) [[BR]] |
636 | | Multiple base-station management service operating on custom PC node (Rutgers WINLAB) [[BR]] |
637 | | Data-path gateway service operating on custom PC node (Rutgers WINLAB) [[BR]] |
638 | | Mobility/handover/multi-homing service (coordinated by Wisconsin/Clemson) [[BR]] |
639 | | WiFi access point for dual-homing operating on custom PC node (Rutgers WINLAB) [[BR]] |
640 | | Vehicular mobile station operating on custom PC node (Rutgers WINLAB) [[BR]] |
641 | | Fixed “mobile station” for remote experimenters operating on custom PC node (Rutgers WINLAB) [[BR]] |
642 | | Unlocked Android WiMAX/WiFi handsets. (Wisconsin) [[BR]] |
643 | | |
644 | | d) Support for unified GENI operations: [[BR]] |
645 | | Forward site monitoring information to the central monitoring server (Rutgers WINLAB) [[BR]] |
646 | | Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]] |
647 | | When necessary, do an “emergency stop” of your transmissions. [[BR]] |
648 | | |
649 | | e) Support for experiments: [[BR]] |
650 | | Local research experiments [[BR]] |
651 | | Experiments by remote experimenters, including those at tutorials [[BR]] |
652 | | Classroom instruction experiments by students (NYU Poly) [[BR]] |
653 | | Multi-site experiments, e.g., MobilityFirst (Rutgers WINLAB) [[BR]] |
654 | | |
655 | | |
656 | | |