Changes between Version 40 and Version 41 of GEC15Agenda/WiMAXUpdate


Ignore:
Timestamp:
10/30/12 10:30:47 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC15Agenda/WiMAXUpdate

    v40 v41  
    355355a)  Status of deployments planned for Spiral 4:  [[BR]]
    356356 Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
    357  Install Airspan base station(s), with local NetSpan management system  (partial 1 of 3 on-the-air) [[BR]]
     357 Install Airspan base station(s), with local NetSpan management system  (partial: 3 installed, 1 of 3 on-the-air) [[BR]]
    358358 Optional when multiple cells:  backhaul control and data traffic to central equipment site  (yes) [[BR]]
    359359 Add OMF/OML structures, including LoginService  (pending) [[BR]]
     
    398398
    399399GEC14 status:  [[BR]]
     400 * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/2012_07_09_Geni_Conference.ppt  slides]  [[BR]]
     401
    400402 * Extension plan  [[BR]]
    401403  * Add Airspan to building/tower near Capitol.  [[BR]]
     
    404406  * x1 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    405407
    406  * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/2012_07_09_Geni_Conference.ppt  slides]  [[BR]] 
     408
     409GEC15 status:  [[BR]]
     410 * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/mse-banerjee.pdf  slides]  [[BR]]
     411
    407412
    408413 * Airspan status [[BR]]
    409   * Purchased and received the Mean Well 450W power supply [[BR]]
    410   * Received missing mounting brackets for ODU [[BR]]
    411   * Tower analysis should have been completed by Friday [[BR]]
    412   * Unanswered questions:  length of burial cat5e; distance to junction box [[BR]]
    413   * Recommendation:  include surge protector in long cat5e cable! [[BR]]
     414  * Planned installation blocked by site issues [[BR]]
     415  * Instead, will move quickly to install on CS building (where Cisco base station was installed) [[BR]]
     416
     417a)  Status of deployments planned for Spiral 4:  [[BR]]
     418 Get experimental frequency from the FCC, that does not interfere with Clearwire services  (yes)  [[BR]]
     419 Install Airspan base station(s), with local NetSpan management system  (no;  restarting) [[BR]]
     420 Optional when multiple cells:  backhaul control and data traffic to central equipment site  (?) [[BR]]
     421 Add OMF/OML structures, including LoginService  (partial) [[BR]]
     422 Connect via switch to I2 backbone, via OF switches if there (?) [[BR]]
     423 WiFi access point for dual-homing operating on custom PC node  (no)  [[BR]]
     424 Vehicular mobile station operating on custom PC node  (no)  [[BR]]
     425 Fixed “mobile station” for remote experimenters operating on custom PC node  (no) [[BR]]
     426
     427b)  Plan for local research experiments in Spiral 5:   [[BR]]
     428 Focus on mobility experiments from bus  [[BR]]
     429 Planning multi-site video experiment with NYU Poly  [[BR]]
     430 Begin classroom use in Spring 2013  [[BR]]
     431
     432c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
     433 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     434 Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     435 Connection to I2  (coordinated by BBN) [[BR]]
     436 GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
     437 Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     438 Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     439 Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
     440 WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB) (or use local service?) [[BR]]
     441 Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     442 Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
     443 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
     444
     445d)  Support for unified GENI operations:  [[BR]]
     446 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
     447 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
     448 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
     449
     450e)  Support for experiments:  [[BR]]
     451 Local research experiments [[BR]]
     452 Experiments by remote experimenters, including those at tutorials  [[BR]]
     453 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
     454 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     455
     456
     457=== 3.6)  University of Michigan Site Deployment Plan ===
     4583:40pm [[BR]]
     459Morley Mao  (Michigan)  [[BR]]
     460
     461GEC14 status:  [[BR]]
     462 * Extension plan  [[BR]]
     463  * Add one Airspan on top of building  [[BR]]
     464  * Will signals penetrate into buildings?  [[BR]]
     465  * One frequency from Clearwire  [[BR]]
     466  * x1 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
     467  * Location and backhaul [[BR]]
     468  * Mobility and handover [[BR]]
     469
     470 * Status [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf  slides] from GEC13 [[BR]]
     471  * Recent report:  now mounting and painting antenna  [[BR]]
    414472
    415473a)  Status of deployments planned for Spiral 4:  [[BR]]
     
    453511
    454512
    455 === 3.6)  University of Michigan Site Deployment Plan ===
    456 3:40pm [[BR]]
    457 Morley Mao  (Michigan)  [[BR]]
    458 
    459 GEC14 status:  [[BR]]
     513
     514
     515=== 3.7)  Wayne State University Site Deployment Plan ===
     5163:45m   [[BR]]
     517Hongwei Zhang, Yu Chu (Wayne State)  [[BR]]
     518
     519GEC14 status:
    460520 * Extension plan  [[BR]]
    461   * Add one Airspan on top of building  [[BR]]
    462   * Will signals penetrate into buildings?  [[BR]]
    463   * One frequency from Clearwire  [[BR]]
    464   * x1 (2510 Lo:  2496 to 2570 MHz)  [[BR]]
    465   * Location and backhaul [[BR]]
    466   * Mobility and handover [[BR]]
    467 
    468  * Status [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf  slides] from GEC13 [[BR]]
    469   * Recent report:  now mounting and painting antenna  [[BR]]
     521  * Plan: one site with three sectors, and 3 Airspan base stations.  [[BR]] 
     522  * One frequency (10MHz) from Clearwire [[BR]] 
     523  * x3 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
     524
     525 * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/WayneWiMAX-deployment-planAndStatus-GEC14.pdf  slides]  [[BR]]
     526
     527 * Spectrum loan from Clearwire: done [[BR]] 
     528  * 10MHz band: 2591MHz – 2601MHz (belongs to 2510 Mid band of 2560MHz~2630MHz) [[BR]] 
     529  * Current loan valid until March 1, 2013; to be renewed annually afterwards [[BR]] 
     530
     531 * WiMAX network equipment [[BR]] 
     532  * Being in touch with facilities and campus IT on deployment logistics [[BR]] 
     533  * Received three WiMAX base stations and accessories on 06/25/2012 [[BR]] 
     534  * Now working with facilities and campus IT on concrete action items [[BR]] 
     535  * Equipment purchase: mounting masts, networking, electricity; servers, laptops (+ USB dongles through UWM) [[BR]] 
     536  * Contracting roof-mount and installation [[BR]] 
     537
     538 * By end of Year 1 [[BR]] 
     539  * Complete installation and measurement study of the WiMAX network [[BR]] 
     540  * Time to get OMF running? [[BR]] 
     541  * Connect the WiMAX network to GENI backbone via VLAN [[BR]] 
     542  * One source of uncertainty: re-roofing work on the deployment site until mid/late August [[BR]] 
     543  * Exploring mechanisms for deploying WiMAX network in parallel [[BR]] 
     544  * (No need to worry about re-roofing in the coming 20-30 years ) [[BR]] 
     545
     546 * Year 2 [[BR]] 
     547  * Incorporating OpenXC vehicular sensing and infotainment platform [[BR]] 
     548  * Enabling handoff between different base stations/sectors [[BR]] 
    470549
    471550a)  Status of deployments planned for Spiral 4:  [[BR]]
     
    511590
    512591
    513 === 3.7)  Wayne State University Site Deployment Plan ===
    514 3:45m   [[BR]]
    515 Hongwei Zhang, Yu Chu (Wayne State)  [[BR]]
    516 
    517 GEC14 status:
    518  * Extension plan  [[BR]]
    519   * Plan: one site with three sectors, and 3 Airspan base stations.  [[BR]] 
    520   * One frequency (10MHz) from Clearwire [[BR]] 
    521   * x3 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    522 
    523  * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/WayneWiMAX-deployment-planAndStatus-GEC14.pdf  slides]  [[BR]]
    524 
    525  * Spectrum loan from Clearwire: done [[BR]] 
    526   * 10MHz band: 2591MHz – 2601MHz (belongs to 2510 Mid band of 2560MHz~2630MHz) [[BR]] 
    527   * Current loan valid until March 1, 2013; to be renewed annually afterwards [[BR]] 
    528 
    529  * WiMAX network equipment [[BR]] 
    530   * Being in touch with facilities and campus IT on deployment logistics [[BR]] 
    531   * Received three WiMAX base stations and accessories on 06/25/2012 [[BR]] 
    532   * Now working with facilities and campus IT on concrete action items [[BR]] 
    533   * Equipment purchase: mounting masts, networking, electricity; servers, laptops (+ USB dongles through UWM) [[BR]] 
    534   * Contracting roof-mount and installation [[BR]] 
    535 
    536  * By end of Year 1 [[BR]] 
    537   * Complete installation and measurement study of the WiMAX network [[BR]] 
    538   * Time to get OMF running? [[BR]] 
    539   * Connect the WiMAX network to GENI backbone via VLAN [[BR]] 
    540   * One source of uncertainty: re-roofing work on the deployment site until mid/late August [[BR]] 
    541   * Exploring mechanisms for deploying WiMAX network in parallel [[BR]] 
    542   * (No need to worry about re-roofing in the coming 20-30 years ) [[BR]] 
    543 
    544  * Year 2 [[BR]] 
    545   * Incorporating OpenXC vehicular sensing and infotainment platform [[BR]] 
    546   * Enabling handoff between different base stations/sectors [[BR]] 
     592=== 3.8) NYU Poly Site Update ===
     5933:50pm   [[BR]]
     594Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]]
     595
     596GEC14 status:  [[BR]]
     597 * Status  [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf  slides] [[BR]]
     598
     599 * Operational OMF/OML installation[[BR]]
     600  * Created OML-ized applications that may be useful to other sites (VLC, BitTorrent client, HTTP server and client)[[BR]]
     601  * More under development, e.g. OMF driver for Teltonika WiMAX devices[[BR]]
     602
     603 * Testbed open to experimenters since GEC12[[BR]]
     604  * Register at http://witestlab.poly.edu[[BR]]
     605  * Experimenter outreach with tutorials at GEC13, Tridentcom, GEC14[[BR]]
     606
     607 * Connected to I2 backbone network[[BR]]
     608  * New wimaxrf[[BR]]
     609  * Multi-site capability demonstrated at demo night, tutorial[[BR]]
     610
     611 * Extra capabilities and tools[[BR]]
     612  * Environmental sensors (temperature, humidity, light)[[BR]]
     613
     614GEC15 status:  [[BR]]
     615
     616 [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]]
    547617
    548618a)  Status of deployments planned for Spiral 4:  [[BR]]
     
    587657
    588658
    589 
    590 === 3.8) NYU Poly Site Update ===
    591 3:50pm   [[BR]]
    592 Thanasis Korakis, Fraida Fund (NYU-Poly)[[BR]]
    593 
    594 GEC14 status:  [[BR]]
    595  * Status  [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC14-WiMAX-NYUPoly.pdf  slides] [[BR]]
    596 
    597  * Operational OMF/OML installation[[BR]]
    598   * Created OML-ized applications that may be useful to other sites (VLC, BitTorrent client, HTTP server and client)[[BR]]
    599   * More under development, e.g. OMF driver for Teltonika WiMAX devices[[BR]]
    600 
    601  * Testbed open to experimenters since GEC12[[BR]]
    602   * Register at http://witestlab.poly.edu[[BR]]
    603   * Experimenter outreach with tutorials at GEC13, Tridentcom, GEC14[[BR]]
    604 
    605  * Connected to I2 backbone network[[BR]]
    606   * New wimaxrf[[BR]]
    607   * Multi-site capability demonstrated at demo night, tutorial[[BR]]
    608 
    609  * Extra capabilities and tools[[BR]]
    610   * Environmental sensors (temperature, humidity, light)[[BR]]
    611 
    612 GEC15 status:  [[BR]]
    613 
    614  [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]]
    615 
    616 a)  Status of deployments planned for Spiral 4:  [[BR]]
    617  Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    618  Install Airspan base station(s), with local NetSpan management system  [[BR]]
    619  Optional when multiple cells:  backhaul control and data traffic to central equipment site  [[BR]]
    620  Add OMF/OML structures, including LoginService [[BR]]
    621  Connect via switch to I2 backbone, via OF switches if there [[BR]]
    622  WiFi access point for dual-homing operating on custom PC node  [[BR]]
    623  Vehicular mobile station operating on custom PC node    [[BR]]
    624  Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    625 
    626 b)  Plan for local research experiments in Spiral 5:   [[BR]]
    627  Focus on goals, configurations, steps  [[BR]]
    628  Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    629 
    630 c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    631  Additional base station  (Rutgers WINLAB)  [[BR]]
    632  Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
    633  Login Service plus OMF/OML services operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    634  Connection to I2  (coordinated by BBN) [[BR]]
    635  GIMI I&M services (UMass Amherst/NYU Poly)  [[BR]]
    636  Multiple base-station management service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    637  Data-path gateway service operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    638  Mobility/handover/multi-homing service  (coordinated by Wisconsin/Clemson)   [[BR]]
    639  WiFi access point for dual-homing operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    640  Vehicular mobile station operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    641  Fixed “mobile station” for remote experimenters operating on custom PC node  (Rutgers WINLAB)  [[BR]]
    642  Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    643 
    644 d)  Support for unified GENI operations:  [[BR]]
    645  Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    646  Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    647  When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    648 
    649 e)  Support for experiments:  [[BR]]
    650  Local research experiments [[BR]]
    651  Experiments by remote experimenters, including those at tutorials  [[BR]]
    652  Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    653  Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
    654 
    655 
    656 
    657659=== 3.9) UMass Amherst Site Update ===
    6586603:55pm   [[BR]]
     
    798800
    799801 * Overview of current functions and software  [[BR]]
     802 * [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/mse-banerjee.pdf  slides]  [[BR]]
    800803
    801804=== 4.4)  Mobility/handover services  ===