Changes between Version 35 and Version 36 of GEC15Agenda/WiMAXUpdate


Ignore:
Timestamp:
10/30/12 08:15:25 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC15Agenda/WiMAXUpdate

    v35 v36  
    154154Each site will indicate:  [[BR]]
    155155
    156 a)  Where necessary, complete deployments planned for Spiral 4:  [[BR]]
    157 
    158 b)  Plan local research experiments for Spiral 5  [[BR]]
    159 
    160 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)  [[BR]]
    161 
    162 d)  Support unified GENI operations:  [[BR]]
    163 
    164 e)  Complete and support experiments:  [[BR]]
     156a)  Status of deployments planned for Spiral 4:  [[BR]]
     157
     158b)  Plan for local research experiments in Spiral 5:  [[BR]]
     159
     160c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:  [[BR]]
     161
     162d)  Support for unified GENI operations:  [[BR]]
     163
     164e)  Support for experiments:  [[BR]]
    165165
    166166
     
    182182[http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/BBNStatus%200710wimaxmeeting14gec.ppt slide]  [[BR]]
    183183
    184 a)  Where necessary, complete deployments planned for Spiral 4:  (yes or no)  [[BR]]
     184a)  Status of deployments planned for Spiral 4:  [[BR]]
    185185 Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    186186 Install Airspan base station(s), with local NetSpan management system  [[BR]]
     
    192192 Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    193193
    194 b)  Plan local research experiments for Spiral 5   [[BR]]
     194b)  Plan for local research experiments in Spiral 5:   [[BR]]
    195195 Focus on goals, configurations, steps  [[BR]]
    196196 Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    197197
    198 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)   [[BR]]
     198c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    199199 Additional base station  (Rutgers WINLAB)  [[BR]]
    200200 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     
    210210 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    211211
    212 d)  Support unified GENI operations:  [[BR]]
     212d)  Support for unified GENI operations:  [[BR]]
    213213 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    214214 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    215215 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    216216
    217 e)  Complete and support experiments:  [[BR]]
     217e)  Support for experiments:  [[BR]]
    218218 Local research experiments [[BR]]
    219219 Experiments by remote experimenters, including those at tutorials  [[BR]]
     
    240240Busch campus site:  [[BR]]
    241241
    242 a)  Where necessary, complete deployments planned for Spiral 4:  (yes or no)  [[BR]]
     242a)  Status of deployments planned for Spiral 4:  [[BR]]
    243243 Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    244244 Install Airspan base station(s), with local NetSpan management system  [[BR]]
     
    250250 Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    251251
    252 b)  Plan local research experiments for Spiral 5   [[BR]]
     252b)  Plan for local research experiments in Spiral 5:   [[BR]]
    253253 Focus on goals, configurations, steps  [[BR]]
    254254 Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    255255
    256 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)   [[BR]]
     256c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    257257 Additional base station  (Rutgers WINLAB)  [[BR]]
    258258 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     
    268268 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    269269
    270 d)  Support unified GENI operations:  [[BR]]
     270d)  Support for unified GENI operations:  [[BR]]
    271271 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    272272 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    273273 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    274274
    275 e)  Complete and support experiments:  [[BR]]
     275e)  Support for experiments:  [[BR]]
    276276 Local research experiments [[BR]]
    277277 Experiments by remote experimenters, including those at tutorials  [[BR]]
    278278 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    279279 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     280
    280281
    281282
     
    311312 [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/2012-July-10-GEC%20UCLA%20GEC15.pptx  slides]  [[BR]]
    312313
    313 a)  Where necessary, complete deployments planned for Spiral 4:  (yes or no)  [[BR]]
     314a)  Status of deployments planned for Spiral 4:  [[BR]]
    314315 Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    315316 Install Airspan base station(s), with local NetSpan management system  [[BR]]
     
    321322 Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    322323
    323 b)  Plan local research experiments for Spiral 5   [[BR]]
     324b)  Plan for local research experiments in Spiral 5:   [[BR]]
    324325 Focus on goals, configurations, steps  [[BR]]
    325326 Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    326327
    327 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)   [[BR]]
     328c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    328329 Additional base station  (Rutgers WINLAB)  [[BR]]
    329330 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     
    339340 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    340341
    341 d)  Support unified GENI operations:  [[BR]]
     342d)  Support for unified GENI operations:  [[BR]]
    342343 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    343344 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    344345 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    345346
    346 e)  Complete and support experiments:  [[BR]]
     347e)  Support for experiments:  [[BR]]
    347348 Local research experiments [[BR]]
    348349 Experiments by remote experimenters, including those at tutorials  [[BR]]
    349350 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    350351 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     352
    351353
    352354
     
    406408Greenville site:  [[BR]]
    407409
    408 a)  Where necessary, complete deployments planned for Spiral 4:  (yes or no)  [[BR]]
     410a)  Status of deployments planned for Spiral 4:  [[BR]]
    409411 Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    410412 Install Airspan base station(s), with local NetSpan management system  [[BR]]
     
    416418 Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    417419
    418 b)  Plan local research experiments for Spiral 5   [[BR]]
     420b)  Plan for local research experiments in Spiral 5:   [[BR]]
    419421 Focus on goals, configurations, steps  [[BR]]
    420422 Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    421423
    422 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)   [[BR]]
     424c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    423425 Additional base station  (Rutgers WINLAB)  [[BR]]
    424426 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     
    434436 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    435437
    436 d)  Support unified GENI operations:  [[BR]]
     438d)  Support for unified GENI operations:  [[BR]]
    437439 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    438440 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    439441 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    440442
    441 e)  Complete and support experiments:  [[BR]]
     443e)  Support for experiments:  [[BR]]
    442444 Local research experiments [[BR]]
    443445 Experiments by remote experimenters, including those at tutorials  [[BR]]
    444446 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    445447 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     448
    446449
    447450 
     
    466469  * Recommendation:  include surge protector in long cat5e cable! [[BR]]
    467470
    468 a)  Where necessary, complete deployments planned for Spiral 4:  (yes or no)  [[BR]]
     471a)  Status of deployments planned for Spiral 4:  [[BR]]
    469472 Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    470473 Install Airspan base station(s), with local NetSpan management system  [[BR]]
     
    476479 Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    477480
    478 b)  Plan local research experiments for Spiral 5   [[BR]]
     481b)  Plan for local research experiments in Spiral 5:   [[BR]]
    479482 Focus on goals, configurations, steps  [[BR]]
    480483 Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    481484
    482 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)   [[BR]]
     485c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    483486 Additional base station  (Rutgers WINLAB)  [[BR]]
    484487 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     
    494497 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    495498
    496 d)  Support unified GENI operations:  [[BR]]
     499d)  Support for unified GENI operations:  [[BR]]
    497500 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    498501 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    499502 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    500503
    501 e)  Complete and support experiments:  [[BR]]
     504e)  Support for experiments:  [[BR]]
    502505 Local research experiments [[BR]]
    503506 Experiments by remote experimenters, including those at tutorials  [[BR]]
     
    522525  * Recent report:  now mounting and painting antenna  [[BR]]
    523526
    524 a)  Where necessary, complete deployments planned for Spiral 4:  (yes or no)  [[BR]]
     527a)  Status of deployments planned for Spiral 4:  [[BR]]
    525528 Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    526529 Install Airspan base station(s), with local NetSpan management system  [[BR]]
     
    532535 Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    533536
    534 b)  Plan local research experiments for Spiral 5   [[BR]]
     537b)  Plan for local research experiments in Spiral 5:   [[BR]]
    535538 Focus on goals, configurations, steps  [[BR]]
    536539 Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    537540
    538 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)   [[BR]]
     541c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    539542 Additional base station  (Rutgers WINLAB)  [[BR]]
    540543 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     
    550553 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    551554
    552 d)  Support unified GENI operations:  [[BR]]
     555d)  Support for unified GENI operations:  [[BR]]
    553556 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    554557 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    555558 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    556559
    557 e)  Complete and support experiments:  [[BR]]
     560e)  Support for experiments:  [[BR]]
    558561 Local research experiments [[BR]]
    559562 Experiments by remote experimenters, including those at tutorials  [[BR]]
    560563 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    561564 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     565
    562566
    563567
     
    598602  * Enabling handoff between different base stations/sectors [[BR]] 
    599603
    600 a)  Where necessary, complete deployments planned for Spiral 4:  (yes or no)  [[BR]]
     604a)  Status of deployments planned for Spiral 4:  [[BR]]
    601605 Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    602606 Install Airspan base station(s), with local NetSpan management system  [[BR]]
     
    608612 Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    609613
    610 b)  Plan local research experiments for Spiral 5   [[BR]]
     614b)  Plan for local research experiments in Spiral 5:   [[BR]]
    611615 Focus on goals, configurations, steps  [[BR]]
    612616 Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    613617
    614 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)   [[BR]]
     618c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    615619 Additional base station  (Rutgers WINLAB)  [[BR]]
    616620 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     
    626630 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    627631
    628 d)  Support unified GENI operations:  [[BR]]
     632d)  Support for unified GENI operations:  [[BR]]
    629633 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    630634 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    631635 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    632636
    633 e)  Complete and support experiments:  [[BR]]
     637e)  Support for experiments:  [[BR]]
    634638 Local research experiments [[BR]]
    635639 Experiments by remote experimenters, including those at tutorials  [[BR]]
     
    639643
    640644
     645
    641646=== 3.8) NYU Poly Site Update ===
    6426473:50pm   [[BR]]
     
    665670 [http://groups.geni.net/geni/attachment/wiki/GEC15Agenda/WiMAXUpdate/NYUPolyGEC15.pdf slides] [[BR]]
    666671
    667 a)  Where necessary, complete deployments planned for Spiral 4:  (yes or no)  [[BR]]
     672a)  Status of deployments planned for Spiral 4:  [[BR]]
    668673 Get experimental frequency from the FCC, that does not interfere with Clearwire services  [[BR]]
    669674 Install Airspan base station(s), with local NetSpan management system  [[BR]]
     
    675680 Fixed “mobile station” for remote experimenters operating on custom PC node   [[BR]]
    676681
    677 b)  Plan local research experiments for Spiral 5   [[BR]]
     682b)  Plan for local research experiments in Spiral 5:   [[BR]]
    678683 Focus on goals, configurations, steps  [[BR]]
    679684 Identify necessary extended site capabilities needed in Spiral 5  [[BR]]
    680685
    681 c)  Complete deployments of necessary extended site capabilities needed in Spiral 5, from this list of options:  (technology supplier or coordinator shown)   [[BR]]
     686c)  Plan to complete deployments of extended site capabilities needed in Spiral 5:   [[BR]]
    682687 Additional base station  (Rutgers WINLAB)  [[BR]]
    683688 Custom PC nodes  ("yellow nodes")  (Rutgers WINLAB)  [[BR]]
     
    693698 Unlocked Android WiMAX/WiFi handsets.   (Wisconsin)  [[BR]]
    694699
    695 d)  Support unified GENI operations:  [[BR]]
     700d)  Support for unified GENI operations:  [[BR]]
    696701 Forward site monitoring information to the central monitoring server  (Rutgers WINLAB)  [[BR]]
    697702 Cooperate with Rutgers WINLAB and Clearwire to avoid interference with Clearwire’s services [[BR]]
    698703 When necessary, do an “emergency stop” of your transmissions.  [[BR]]
    699704
    700 e)  Complete and support experiments:  [[BR]]
     705e)  Support for experiments:  [[BR]]
    701706 Local research experiments [[BR]]
    702707 Experiments by remote experimenters, including those at tutorials  [[BR]]
    703708 Classroom instruction experiments by students   (NYU Poly)  [[BR]]
    704709 Multi-site experiments, e.g., MobilityFirst  (Rutgers WINLAB) [[BR]]
     710
    705711
    706712