Changes between Version 39 and Version 40 of GEC14Agenda/WiMAXDeploymentsAndExperiments


Ignore:
Timestamp:
07/13/12 15:23:37 (12 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC14Agenda/WiMAXDeploymentsAndExperiments

    v39 v40  
    448448  * Mobility and handover [[BR]]
    449449
    450  * Planned local experiments [[BR]]
    451 
    452 [  max 2  slides]  [[BR]] 
    453 
     450 * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/GEC13%20%20drexel%20%20GENI.ppt slides}  from GEC13 [[BR]]
     451
     452 * Kevin Wanuga reports: [[BR]]
     453  * Planning for top of 18-story building;  3m radiation safety clearance [[BR]]
     454  * More urban than Temple [[BR]]
     455  * Airspan order placed;  not yet received [[BR]]
     456  * Kiva networks to install base station [[BR]]
     457  * Contract engineer mast;  recommendation from Giovanni:  check masts at GNE supply [[BR]]
     458  * Questions about power cable; recommendation from Harry:  call us, and we can explain parameters [[BR]]
    454459
    455460=== 4.10) UMass Amherst Site Update ===
     
    458463
    459464 * Status [[BR]]
    460   * Add OMF/OML  [[BR]]
    461   * Connect to I2 backbone network  [[BR]]
    462  
     465  * Add OMF/OML:  have installed  [[BR]]
     466  * Connect to I2 backbone network:  plan to do soon  [[BR]]
    463467
    464468 * Planned experiments:  use to integrate GIMI tools [[BR]]
    465 
    466 [  max 2  slides]  [[BR]] 
    467469
    468470=== 4.11) NYU Poly Site Update ===