Changes between Version 37 and Version 38 of GEC14Agenda/WiMAXDeploymentsAndExperiments


Ignore:
Timestamp:
07/13/12 14:42:11 (7 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC14Agenda/WiMAXDeploymentsAndExperiments

    v37 v38  
    368368  * Mobility and handover [[BR]]
    369369
    370  * Status [ http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf  slides] from GEC13 [[BR]]
     370 * Status [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/WIMAXexperimentMichigan.pdf  slides] from GEC13 [[BR]]
    371371  * Recent report:  now mounting and painting antenna  [[BR]]
    372372
     
    380380  * One frequency (10MHz) from Clearwire [[BR]] 
    381381  * x3 (2510 Mid:  2560MHz to 2630MHz)  [[BR]]
    382   * License status [[BR]]
    383   * Location and backhaul [[BR]]
    384   * Mobility and handover [[BR]]
    385 
    386  * Planned local experiments [[BR]]
    387 
    388 [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/WayneWiMAX-deployment-planAndStatus-GEC14.pdf  slides]  [[BR]] 
     382
     383 * Status [http://groups.geni.net/geni/attachment/wiki/GEC14Agenda/WiMAXDeploymentsAndExperiments/WayneWiMAX-deployment-planAndStatus-GEC14.pdf  slides]  [[BR]]
     384
     385 * Spectrum loan from Clearwire: done [[BR]] 
     386  * 10MHz band: 2591MHz – 2601MHz (belongs to 2510 Mid band of 2560MHz~2630MHz) [[BR]] 
     387  * Current loan valid until March 1, 2013; to be renewed annually afterwards [[BR]] 
     388
     389 * WiMAX network equipment [[BR]] 
     390  * Being in touch with facilities and campus IT on deployment logistics [[BR]] 
     391  * Received three WiMAX base stations and accessories on 06/25/2012 [[BR]] 
     392  * Now working with facilities and campus IT on concrete action items [[BR]] 
     393  * Equipment purchase: mounting masts, networking, electricity; servers, laptops (+ USB dongles through UWM) [[BR]] 
     394  * Contracting roof-mount and installation [[BR]] 
     395
     396 * By end of Year 1 [[BR]] 
     397  * Complete installation and measurement study of the WiMAX network [[BR]] 
     398  * Time to get OMF running? [[BR]] 
     399  * Connect the WiMAX network to GENI backbone via VLAN [[BR]] 
     400  * One source of uncertainty: re-roofing work on the deployment site until mid/late August [[BR]] 
     401  * Exploring mechanisms for deploying WiMAX network in parallel [[BR]] 
     402  * (No need to worry about re-roofing in the coming 20-30 years ) [[BR]] 
     403
     404 * Year 2 [[BR]] 
     405  * Incorporating OpenXC vehicular sensing and infotainment platform [[BR]] 
     406  * Enabling handoff between different base stations/sectors [[BR]] 
     407
     408 
    389409
    390410=== 4.8)  Temple University Site Deployment Plan ===