Changes between Version 30 and Version 31 of GEC14Agenda/WiMAXDeploymentsAndExperiments
- Timestamp:
- 07/13/12 11:24:30 (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC14Agenda/WiMAXDeploymentsAndExperiments
v30 v31 39 39 40 40 * Review of current licensing and leasing arrangements [[BR]] 41 * Current GENI WiMAX sites, licenses and base stations [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/030912_GENIWiMAXSites_Frequencies.xls spreadsheet] [[BR]] 41 * Current GENI WiMAX sites, licenses and base stations 42 * [http://groups.geni.net/geni/attachment/wiki/GEC13Agenda/WiMAXPlanning/030912_GENIWiMAXSites_Frequencies.xls spreadsheet] [[BR]] 42 43 * Proposed leases by Clearwire, some limited to 1 year, up to $4k to renew, with "indemnification" [[BR]] 44 * Kevin Wanuga of Drexel reports: When Drexel general counsel was negotiating with Clearwire, Clearwire was willing to drop indemnification clause, and some other difficult language, before agreement was finalized and signed; Drexel also has an experimental license. [[BR]] 43 45 * Status of discussions with Clearwire [[BR]] 46 * Harry reports: waiting to organize another call with Paul McCarthy at Clearwire. [[BR]] 44 47 * Status of discussions with the FCC [[BR]] 45 * Possible approach: [[BR]] 48 * Harry reports: GENI operates using experimental license as FCC intended; waiting for contact to review GENI documents. 49 * Possible approach, as an alternative to an agreement that leases Clearwire spectrum to GENI sites: [[BR]] 46 50 * Operate under an experimental license from the FCC [[BR]] 47 51 * Agreement between Rutgers WINLAB and Clearwire, on enhanced cooperation [[BR]] … … 71 75 Ivan Seskar (Rutgers WINLAB) 72 76 73 * Update WiMAX RF AggMgr for NEC base station (2.5.3+) [[BR]] 74 * Feed to centralized managment DB (at WINLAB) [[BR]] 75 76 [ 2 config, status slides] [[BR]] 77 77 * Have updated WiMAX RF AggMgr for NEC base station to 2.5.3+; additional updates coming [[BR]] 78 * Need to feed management data to centralized DB at WINLAB, for GENI-wide monitoring [[BR]] 79 * Possible access to Clearwire, others. [[BR]] 78 80 * Coming: New WiMAX RF AggMgr for Airspan base station [[BR]] 81 * Plan first version by GEC15 79 82 80 83 … … 87 90 * Also, commercial handover technology available from Airspan. (Gregg Tome (Airspan)) [[BR]] 88 91 89 * Update on process to find a good solution [[BR]] 90 91 [ 1 status slide] [[BR]] 92 * Parmesh reports: student has started on process to find a good solution, will report at GEC15 [[BR]] 93 92 94 93 95 === 2.5) Add "yellow nodes" to WiMAX Sites, as WiFi access points and fixed "mobile stations" === … … 95 97 Ivan Seskar (WINLAB) [[BR]] 96 98 97 * Configuration of "yellow nodes", with interfaces, management, etc.[[BR]]98 99 * Uses for "yellow nodes": WiFi access points and fixed "mobile stations"[[BR]]99 * These are "yellow nodes", introduced in ORBIT testbed [[BR]] 100 * Can be used as: fixed nodes; WiFi access points; fixed "mobile stations" [[BR]] 101 * Currently used by: Rutgers WINLAB; NYU Poly; BBN [[BR]] 100 102 101 103 * How can these be provided to sites? [[BR]] 102 103 [ 1 config, status slide] [[BR]] 104 * Approximate cost: $800 - $1500 [[BR]] 105 * Rutgers WINLAB has parts list, has been assembling [[BR]] 106 * Need to poll sites for interest; then work up a plan. [[BR]] 104 107 105 108 === 2.6) Add OMF/OML to WiMAX sites === 106 109 2:05pm [[BR]] 107 Derek Meyer (Wisconsin), Manu Gosain (GPO)[[BR]]110 Fraida Fund (NYU Poly), Manu Gosain (GPO), Derek Meyer (Wisconsin), [[BR]] 108 111 109 112 * Equip a WiMAX site with full OMF/OML capabilities, installing on VMs [[BR]] 110 113 * Include Login Service for Remote Users [[BR]] 111 114 115 * NYU Poly experience [[BR]] 116 117 * BBN experience [[BR]] 118 112 119 * Wisconsin experience [[BR]] 113 120 114 [ 1 config, status slide] [[BR]]115 116 121 * Coming: plan to federate with ProtoGENI cluster [[BR]] 122 * Reference: 117 123 118 124