Changes between Version 8 and Version 9 of GEC13Agenda/WiMAXPlanning
- Timestamp:
- 03/07/12 16:12:41 (13 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
GEC13Agenda/WiMAXPlanning
v8 v9 28 28 29 29 === 2.1) BBN Site Extension Plan === 30 8:35am Manu Gosain (GPO) 31 32 33 At BBN: Replace NEC BS on roof with Airspan BS [[BR]] 34 Experimental licenses: [[BR]] 35 10MHz channel frequency: 2610MHz [[BR]] 36 5MHz channel frequency: 2610MHz [[BR]] 30 8:35am [[BR]] 31 Manu Gosain (GPO) [[BR]] 32 33 At BBN: 34 Replace NEC BS on roof with Airspan BS [[BR]] 35 Experimental license, 10MHz channel, 2610MHz [[BR]] 36 Reuse NEC BS with separate frequency [[BR]] 37 Experimental licenses, 5MHz channel, 2610MHz [[BR]] 37 38 38 39 x1 (2510 Mid: 2560MHz to 2630MHz) [[BR]] 39 40 40 Status [ slides] [[BR]] 41 Status [ 3 slides] [[BR]] 42 Bringup Airspan [[BR]] 43 Add OMF/OML [[BR]] 44 Connect to I2 backbone network [[BR]] 41 45 42 46 === 2.2) WINLAB/Rutgers University Site Extension Plan === … … 52 56 x1 (2510 Mid: 2560MHz to 2630MHz) [[BR]] 53 57 58 Status [ slides] [[BR]] 54 59 55 60 === 2.3) UCLA Site Extension Plans === … … 64 69 x1 (2510 Mid: 2560MHz to 2630MHz) [[BR]] 65 70 71 Extension plan [ 4 slides] [[BR]] 72 License status [[BR]] 73 Location and backhaul [[BR]] 74 Mobility and handover [[BR]] 75 Planned experiments [[BR]] 76 77 Status [ 2 slides] [[BR]] 78 Add OMF/OML [[BR]] 79 Connect to I2 backbone network [[BR]] 80 66 81 === 2.4) Clemson University Site Deployment Plan === 67 82 8:55am [[BR]] … … 73 88 Want handover near I85/I385 intersection. [[BR]] 74 89 75 Utilize Clemson existing Educational Broadband Services (EBS) license? [[BR]] 76 90 Extension plan [ 4 slides] [[BR]] 91 License status [[BR]] 92 Location and backhaul [[BR]] 93 Mobility and handover [[BR]] 94 Planned experiments [[BR]] 77 95 78 96 === 2.5) University of Wisconsin Site Extension Plan === … … 80 98 Suman Banerjee (Wisconsin) and Derek Meyer (Wisconsin) [[BR]] 81 99 82 [http://groups.geni.net/geni/attachment/wiki/GEC12WiMaxDeploymentAndExperimentation/UW-Madison_GEC12_Wimax.ppt slides] [[BR]]83 84 100 Considering expansion to two possible locations: Madison Metro; and Dept of ? near Capitol. 85 101 … … 88 104 Connect via Madison unified fiber project [[BR]] 89 105 Outside contributions for power and poles. [[BR]] 106 107 Extension plan [ 4 slides] [[BR]] 108 License status [[BR]] 109 Location and backhaul [[BR]] 110 Mobility and handover [[BR]] 111 Planned experiments [[BR]] 112 113 Status [ 2 slides] [[BR]] 114 Add OMF/OML [[BR]] 115 Connect to I2 backbone network [[BR]] 116 90 117 91 118 === 2.6) University of Michigan Site Deployment Plan === … … 93 120 Morley Mao (Michigan) [[BR]] 94 121 95 [http://groups.geni.net/geni/attachment/wiki/GEC12WiMaxDeploymentAndExperimentation/wimaxGEC12Michigan.pptx slides] [[BR]]96 97 No EBS license; working with Wayne State on licenses. [[BR]]98 99 122 Identified several roof-top locations; aesthetics approval required. [[BR]] 100 101 123 Will signals penetrate into buildings? [[BR]] 124 125 Extension plan [ 4 slides] [[BR]] 126 License status [[BR]] 127 Location and backhaul [[BR]] 128 Mobility and handover [[BR]] 129 Planned experiments [[BR]] 102 130 103 131 === 2.7) Wayne State University Site Deployment Plan === … … 105 133 Hongwei Zhang (Wayne State) [[BR]] 106 134 107 [http://groups.geni.net/geni/attachment/wiki/GEC12WiMaxDeploymentAndExperimentation/WayneWiMAX-deployment-plan-GEC12.pdf slides] [[BR]]108 109 135 Considering: one site with three sectors; three separated sites. [[BR]] 110 136 111 Wayne State had EBS spectrum in 2.6GHz band, but leased out to Clearwire. [[BR]] 112 Talking with Clearwire about loan of frequencies; concerns about their need to change frequencies, and radiation into Canada. [[BR]] 113 114 Possibly consider 3.65GHz band, with Intel 6250 modem, where no interference? Concerns about: coverage; lack of MS devices. [[BR]] 137 Extension plan [ 4 slides] [[BR]] 138 License status [[BR]] 139 Location and backhaul [[BR]] 140 Mobility and handover [[BR]] 141 Planned experiments [[BR]] 115 142 116 143 === 2.7) Temple University Site Deployment Plan === … … 118 145 Hongwei Zhang (Wayne State) [[BR]] 119 146 147 148 Extension plan [ 4 slides] [[BR]] 149 License status [[BR]] 150 Location and backhaul [[BR]] 151 Mobility and handover [[BR]] 152 Planned experiments [[BR]] 153 120 154 === 2.7) Drexel University Site Deployment Plan === 121 155 9:35am [[BR]] 122 156 Hongwei Zhang (Wayne State) [[BR]] 123 157 158 159 Extension plan [ 4 slides] [[BR]] 160 License status [[BR]] 161 Location and backhaul [[BR]] 162 Mobility and handover [[BR]] 163 Planned experiments [[BR]] 164 124 165 === 2.8) UMass Amherst Update === 125 166 9:40am [[BR]] 126 167 168 Status [ 3 slides] [[BR]] 169 Add OMF/OML [[BR]] 170 Connect to I2 backbone network [[BR]] 171 Planned experiments [[BR]] 172 173 127 174 === 2.9) NYU Poly Site Update === 128 175 9:45am [[BR]] 129 176 177 Status [ 3 slides] [[BR]] 178 Add OMF/OML [[BR]] 179 Connect to I2 backbone network [[BR]] 180 Planned experiments [[BR]] 181 182 130 183 === 2.10) Univ of Colorado at Boulder Site Update === 131 184 9:50am [[BR]] 132 185 186 Status [ 3 slides] [[BR]] 187 Add OMF/OML [[BR]] 188 Connect to I2 backbone network [[BR]] 189 Planned experiments [[BR]] 190 191 133 192 === 2.11) Columbia University Site Update === 134 193 9:55am [[BR]] 194 195 Status [ 3 slides] [[BR]] 196 Add OMF/OML [[BR]] 197 Connect to I2 backbone network [[BR]] 198 Planned experiments [[BR]] 199 135 200 136 201 == 3) Break ==