Changes between Version 13 and Version 14 of GEC13Agenda/WiMAXPlanning


Ignore:
Timestamp:
03/08/12 15:48:23 (13 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • GEC13Agenda/WiMAXPlanning

    v13 v14  
    9696=== 2.5)  University of Wisconsin Site Extension Plan ===
    97979:05am  [[BR]]
    98 Suman Banerjee (Wisconsin) and Derek Meyer (Wisconsin)  [[BR]]
     98Suman Banerjee, Derek Meyer (Wisconsin)  [[BR]]
    9999
    100100Considering expansion to two possible locations:  Madison Metro;  and Dept of ? near Capitol.  [[BR]]
     
    129129=== 2.7)  Wayne State University Site Deployment Plan ===
    1301309:20am   [[BR]]
    131 Hongwei Zhang (Wayne State)  [[BR]]
     131Hongwei Zhang, Yu Chu (Wayne State)  [[BR]]
    132132
    133133Considering: one site with three sectors;  three separated sites.  [[BR]] 
     
    139139 Planned experiments [[BR]]
    140140
    141 === 2.7)  Temple University Site Deployment Plan ===
     141=== 2.8)  Temple University Site Deployment Plan ===
    1421429:30am   [[BR]]
    143143Shan Lin, Jie Wu (Temple)  [[BR]]
     
    150150 Planned experiments [[BR]]
    151151
    152 === 2.7)  Drexel University Site Deployment Plan ===
     152=== 2.9)  Drexel University Site Deployment Plan ===
    1531539:35am   [[BR]]
    154154Kevin Wanuga, Jeff Wildman, Kapil Dandekar (Drexel)  [[BR]]
     
    161161 Planned experiments [[BR]]
    162162
    163 === 2.8) UMass Amherst Site Update ===
     163=== 2.10) UMass Amherst Site Update ===
    1641649:40am   [[BR]]
    165 Cong Wang, Brian Lynn (UMass Amherst)  [[BR]]
     165Cong Wang (UMass Amherst)  [[BR]]
    166166
    167167Status [ 3 slides]  [[BR]]
     
    171171
    172172
    173 === 2.9) NYU Poly Site Update ===
     173=== 2.11) NYU Poly Site Update ===
    1741749:45am   [[BR]]
    175175Thanasis Korakis, Friada Fund (NYU Ploy)[[BR]]
     
    181181
    182182
    183 === 2.10) Univ of Colorado at Boulder Site Update ===
     183=== 2.12) Univ of Colorado at Boulder Site Update ===
    1841849:50am   [[BR]]
    185185Dirk Grunwald (Colorado)  [[BR]]
     
    191191
    192192
    193 === 2.11) Columbia University Site Update ===
     193=== 2.13) Columbia University Site Update ===
    1941949:55am   [[BR]]
    195195Henning Schulzrinne, Jan Janik (Columbia)  [[BR]]
     
    20420410:05am  [[BR]]
    205205
    206 == 4)  GENI WiMAX Deployment Issues ==
     206== 4)  GENI WiMAX Deployment and Strategy Issues ==
    20720710:30am  [[BR]]
    208208
     
    235235
    236236=== 4.4)  Add Mobility/Handover Functions  ===
    237 11:00am  [[BR]]
    238 Parmesh Ramanathan  (Wisconsin)  [[BR]]
     23710:55am  [[BR]]
     238Moderator:  Parmesh Ramanathan  (Wisconsin)  [[BR]]
    239239
    240240Projects requiring handover include:  Clemson, Wayne State and Wisconsin.    [[BR]]
    241241Projects that can contribute handover technology include:  Rutgers WINLAB and Wisconsin.  [[BR]]
    242 Also, commercial handover technology available from Airspan.    [[BR]]
    243 Process to find a solution?    [[BR]]
     242Also, commercial handover technology available from Airspan.  (Gregg Tome (Airspan))  [[BR]]
     243Process to find a good solution?    [[BR]]
    244244
    245245[  slides]  [[BR]]
    246246
    247 
    248 == 5)  GENI Wireless Strategy Issues ==
     247=== 4.5)  Add WiFi AP to sites for dual-homed experiments ===
     24811:05am  [[BR]]
     249Moderator:  Harry Mussman  (GPO)  [[BR]]
     250
     251[  slides]  [[BR]]
     252
     253=== 4.6)  Introducing LTE Equipment  ===
    24925411:10am   [[BR]]
    250 Moderator::Harry Mussman  (GPO)  [[BR]]
    251 
    252 === 5.1)  Future LTE Equipment from Airspan ===
    253 11:10am   [[BR]]
     255Moderator:  Harry Mussman  (GPO)  [[BR]]
     256
     257Ivan Seskar  (WINLAB)  [[BR]]
     258Patrick Gossman (Wayne State)  [[BR]]
    254259Gregg Tome (Airspan)  [[BR]]
    255260
    256261[  slides]  [[BR]]
    257262
    258 == 6)  GENI WiMAX Experimenter Support ==
     263=== 4.7  GIMI I&M tool set to cover WiMAX sites ===
    25926411:15am  [[BR]]
    260 
     265Mike Zink (UMass Amherst)  [[BR]]
     266
     267[  slides]  [[BR]]
     268
     269== 5)  GENI WiMAX Experimenter Support ==
     27011:20am  [[BR]]
    261271Moderator:  Harry Mussman (GPO)  [[BR]]
    262272
     273See R7) for WiMAX experiment configurations.  [[BR]]
     274Feedback from WiMAX tutorial attendees:  who is interested in what experiments?  (Thanasis Korakis (NYU Ploy)) [[BR]]
    263275Round-robin discussion, with a focus on experiment design and issues.  [[BR]]
     276
    264277
    265278== 7) Adjourn ==